Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
12 units across 1 batch
TypeArea sq mCount
12 Premium Residential Bungalows20312
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 3.8 kmPrimary road 2.2 km · Gandhinagar-Ahmedabad HighwayMetro station 672m away (PDPU)Limited bus connectivity nearby
Water & environment
River 1.2 km · SabarmatiWater body 1.4 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹9.45 Cr declared to build 12 flats. What that works out to:
₹80.00 Lakh – ₹1.05 Crdeclared unit pricerange on the filing — not a live asking price
₹78.75 Lakhdeclared cost per flatall-in — land + construction
15%of the cost is land₹488/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Gujarat Revenue Department — Annual Statement of Rates (jantri), 2011
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
₹7,943per sq yd
₹9,500per sq m
Which rate
land + construction: residential flat
Matched to
The rate published for the village of “RAYSAN”.
In force
2011 schedule
What this number is — and isn’t
The minimum value Gujarat’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
GujRERA · Approved building plan
Others
Building Permitapproved 11 May 2022 · 4 yrs ago
The promised possession date (30 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
Building-Use (BU) permission — the occupancy sign-off, on record
All 1 block carry a Building-Use (BU) permission (latest 1 Aug 2024)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.
The approving body, at scale
The approving authority
The body that approved this project. It has approved 2,653 RERA projects across 26 talukas — about 1 in 6 in Gujarat.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
GujRERA · public record
Complaints on GujRERA's register
GujRERA's own register
2 complaints
GujRERA's list gives each complaint's number and date, not its status or outcome — and only disputes escalated to GujRERA appear here at all.
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2,435 residential projects still under way within 25 km. Step out ring by ring:
Of the 668 projects the radar draws within 6 km — every kind, every stage — 313 are residential projects still under way. This list keeps only those, and looks further out.