HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

Silver Oak Prime

P52600030702 · MahaRERA · https://gethorizon.in/projects/silver-oak-prime-solapur-m-corp-solapur-north-78bchd8n

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
Silver Oak Prime
Units
32 units
Mix
32 × 2 BHK
Carpet area
59–60 sq mper-unit range, as filed
Floors
8
Parking
1 spaces
Land area
613 sq m
Sanctioned built-up
1,539 sq m

Timeline

RERA registeredSep 2021
Proposed completionJan 2025
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

32 units across 4 batches
TypeArea sq mCount
2 BHK5914
2 BHK6014
2 BHK592
2 BHK602

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

Skyline builders & Developers

PartnershipPromoter type
Solapur, MAHARASHTRABased in
3Projects
2Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
164 homeson the public record across 3 projects
6,412 sq mbuilt-up filed
2,493 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Skyline builders & Developers— the full portfolio →

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 11 new projects last year
  • 318 nearby projects
≈ locality centre · geocoded, verified · 17.6622, 75.9135 · © OpenStreetMap contributors
Village
Solapur (M Corp.)
Taluka
Solapur North
District
Solapur
Pincode
413003
Survey no.
Survey no 14 1 B plot no A6
North boundary
plot no A5
East boundary
s no 14 A
South boundary
24 M wide road
West boundary
7 m wide road
What’s nearby
SchoolsNearest school 1.2km away · College or university 1.0km away
HealthcareHospital 241m away · 4 clinics within 1km · Pharmacy within 1km
LifestylePark 1.5km away
ShoppingNo supermarket within 2km
Getting around
Expressway 1.2 km · Siddhivinayak RoadPrimary road 808 m · Hydrabad-Bijapur BypassRailway line 1.6 kmRailway station 2.1km away (Solapur)Bus stop within 1km
Water & environment
Water body 1.7 km · Water Well
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹37,454per sq yd
₹44,795per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 42 divisions of “Solapur (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹21,413₹57,149 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
06

Other projects nearby

The register · within 25 km

93 residential projects still under way within 25 km. Step out ring by ring:

Of the 318 projects the radar draws within 6 km — every kind, every stage — 92 are residential projects still under way. This list keeps only those, and looks further out.

12 projects within 1 km — showing the nearest 6.

SolapurResidential / Group Housing

Necklace Pride

Mukhtiyar Shahadat Maindargi

Apr 2024registered
Dec 2027target completion
Government Guidance Rate₹37,454/sq ydScale6 flatsAuthorityMahaRERA
SolapurResidential / Group Housing

RSM Unity Developers

RSM Unity Developers

Aug 2019registered
Dec 2027target completion
Government Guidance Rate₹37,454/sq ydScale2,514 flatsAuthorityMahaRERA
SolapurResidential / Group Housing

Crown Residency

Bhramha Developers

Feb 2023registered
Dec 2026target completion
Government Guidance Rate₹37,454/sq ydScale122 flatsAuthorityMahaRERA
SolapurResidential / Group Housing

Vivek Heights

Azam Ismail Saifan

Dec 2023registered
Dec 2026target completion
Government Guidance Rate₹37,454/sq ydScale8 flatsAuthorityMahaRERA
IndiranagarOthers

NIRMITI LANDMARK

NIRMITI DEVELOPERS

Jan 2022registered
Nov 2027target completion
Scale168 flatsAuthorityMahaRERA
SolapurMixed

The Platino Wing A, B, C

PP Developers

Jun 2023registered
Apr 2030target completion
Government Guidance Rate₹37,454/sq ydScale283 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the locality centre, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • Maharashtra IGR — Annual Statement of Rates.
  5. 05Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  6. 06Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/silver-oak-prime-solapur-m-corp-solapur-north-78bchd8n.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.