Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Guwahati Municipal CorporationMunicipal Corporation2 of 3 projects
Bongaigaon Municipal BoardMunicipal Board1 of 3 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SEUJPUR,ASSAM NEAR TIRUPATI TEMPLE,DIBRUGARH 786001,ASSAM
Pincode
786001
What’s nearby
SchoolsNo schools within 2km · College or university 1.5km away
HealthcareHospital 934m away · 2 clinics within 1km · Doctor's clinic within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 4.2 kmPrimary road 106 m · Assam Trunk RoadRailway line 108 mRailway station 1.9km away (Dibrugarh)Limited bus connectivity nearby
Water & environment
Water body 971 m
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹52.08 Cr declared to build 28 flats. What that works out to:
₹1.86 Crdeclared cost per flatall-in — land + construction
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Assam registration department
No government guidance rate is shown for this project.
Assam's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RERA Assam · Approved building plan
approved 27 Mar 2025 · 1 yr ago
Building Permit no. DM/TECH/BP/253/W-19/746/2024/2665
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan DM/TECH/BP/253/W-19/746/2024/2665 on the approving authority’s portal to confirm the approval.
Planning authority — done
06
Complaints & litigation
RERA Assam · public record
Complaints register
Not published. RERA Assam doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Assam
Litigation
None declared in this filing
Only what the builder declared, or what RERA Assam records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Assam, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
26 residential projects still under way within 25 km. Step out ring by ring:
Of the 53 projects the radar draws within 6 km — every kind, every stage — 26 are residential projects still under way. This list keeps only those, and looks further out.
17 projects between 1 and 3 km — showing the nearest 6.
1.3 km awayMixed Type
ORVILLE RESIDENCY
AMAR CONSTRUCTION COMPANY PROP. ABHISHEK SINGH · DIBRUGARH