HORIZON
Share

TIRUPATI HOMES

P50000002097 · MahaRERA · https://gethorizon.in/projects/tirupati-homes-mehkar-m-cl-qm9wtvis

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
125 units
Mix
60 × 1 BHK · 40 × 2 BHK · 20 × Studio · 5 × Shop
Carpet area
17–915 sq mper-unit range, as filed
Floors
7
Buildings
2
Parking
206 spaces
Land area
6,991 sq m
Sanctioned built-up
10,786 sq m

Timeline

RERA registeredJul 2017
Proposed completionOct 2021
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

125 units across 8 batches
TypeArea sq mCount
Shop171
Shop493
1 BHK44220
Studio29520
1 BHK91540
2 BHK59320
2 BHK59120
Shop201

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

TIRUPATI HOMES

PartnershipPromoter type
Thane, MAHARASHTRABased in
2Projects
2Cities
2017–2026Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
155 homeson the public record across 2 projects
14,162 sq mbuilt-up filed
7,746 sq mland declared
₹6.05 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from TIRUPATI HOMES— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Mehkar (M Cl)
Taluka
Mehkar
District
Buldana
Pincode
443301
Survey no.
75/3K,75/3B,75/3D,75/3F
North boundary
LAYOUT 9 METRE ROAD
East boundary
RAJBINDE FARM
South boundary
LAND PORTIOIN SURVEY NO 75 3
West boundary
LAYOUT 9 METRE ROAD
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.2km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 738 mPrimary road 719 mNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 1.2 kmRiver 2.4 km · Painganga
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹20,853per sq yd
₹24,940per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 1 divisions of “Mehkar (M Cl)” — the city's middle, not this project's own division.
In force
2026-2027 schedule

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
06

Other projects nearby

The register · within Buldana

8 residential projects still under way within Buldana. Step out ring by ring:

Of the 1 projects the radar draws within 6 km — every kind, every stage — none is a residential project still under way. This list keeps only those, and looks further out.

6 projects between 25 and 50 km — showing the nearest 6.

39.5 km awayResidential / Group Housing

SWAPNAPURTI APARTMENT

SAI BUILDERS AND DEVELOPERS · Chikhli

Dec 2025registered
Dec 2027target completion
Government Guidance Rate₹17,759/sq ydScale27 flatsAuthorityMahaRERA
39.9 km awayResidential / Group Housing

Krushna Skyline

Renucorp Private Limited · Chikhli

Dec 2024registered
Mar 2026target completion
Government Guidance Rate₹17,759/sq ydScale15 flatsAuthorityMahaRERA
40.0 km awayResidential / Group Housing

Anilbhau Properties

Nitin Vasantrao Padghan · Chikhli

Jul 2024registered
Jun 2028target completion
Government Guidance Rate₹17,759/sq ydScale103 flatsAuthorityMahaRERA
41.3 km awayMixed

EKDANT RESIDENCY PHASE 4

EKDANT BUILDERS · Chikhli

Oct 2025registered
Dec 2031target completion
Government Guidance Rate₹17,759/sq ydScale28 flatsAuthorityMahaRERA
41.5 km awayResidential / Group Housing

Ayodhya Residency

Shree Infra · Chikhli

Aug 2025registered
Dec 2029target completion
Government Guidance Rate₹17,759/sq ydScale36 flatsAuthorityMahaRERA
49.3 km awayOthers

RAMA APARTMENT

M/S DIGVIJAY CONSTRUCTION · Sundar khed · Buldana

Aug 2020registered
Jun 2026target completion
Scale21 flatsAuthorityMahaRERA

Projects within Buldana, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.