Construction of Registration of 2 Blocks consisting of Combined Basement Floor for Block-1 & 2, Block-1: Basement Floor + Ground Floor + 2 Floors Shopping Complex and Block-2: Basement Floor + Stilt Floor + 1st Floor for Kalyana Mandapam at D.No.189, Rajiv Gandhi Salai (Old Mahabalipuram Road) and Lal Bahadur Shastri Road, Sholinganallur, Chennai comprised in S.No.449/2C1A of Sholinganallur Village, Chennai.
Registration no.
TN/29/Building/0150/2023
Complete project overview — done
02
Builder’s track record
TNRERA · Builder registration
Chandrachola Constructions Private Limited (Lessee) and Thiru. C.Arunagiri (Lesser)
Chandrachola Constructions Private Limited (Lessee) and Thiru. C.Arunagiri (Lesser)Promoter
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
TNRERA · Registration filing
What’s nearby
SchoolsNearest school 1.3km away · College or university 1.3km away · Library 699m away
HealthcareHospital 522m away · 3 clinics within 1km
LifestyleNo parks within 2km · 9 restaurants and cafes within 1km
ShoppingNo supermarket within 2km · Bank 596m away · ATM within 500m
Getting around
Primary road 104 m · Rajiv Gandhi SalaiNo metro or railway within 5km2 bus stops within 500m
Water & environment
Water body 456 m · Mini pond with artificial waterfall
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Tamil Nadu registration department
In Tamil Nadu it’s called the guideline value.
No government guidance rate is shown for this project.
Tamil Nadu publishes street-level guideline values; its full schedule isn't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
TNRERA · Approved building plan
CMDA (Chennai Metropolitan Development Authority)
CMDA (Chennai Metropolitan Development Authority)
approved 11 Apr 2023 · 3 yrs ago
Planning Permission no. PP/NHRB/234/2022
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan PP/NHRB/234/2022 on the approving authority’s portal to confirm the approval.
The approving body, at scale
CMDA (Chennai Metropolitan Development Authority)
Metropolitan development authority
Has approved 1,914 RERA projects — about 1 in 2 in Tamil Nadu, more than any other body in the state.
Builders
1,310
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. TNRERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to TNRERA
Litigation
None declared in this filing
Only what the builder declared, or what TNRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with TNRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
474 residential and mixed-use projects still under way within 25 km. Step out ring by ring:
Of the 60 projects the radar draws within 6 km — every kind, every stage — 50 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.