Complete project overview

K-RERA · Registration filing
Units
84 units
Mix
56 × 2BHK · 28 × 3BHK
Booked
51 of 84 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
2,510 sq m
Floor area
13,729 sq m
Description
URBANSCAPE MIDTOWN

Timeline

RERA registeredApr 2024
Project startedApr 2024
Proposed completionMay 2028
TodayJul 2026
Construction progress

14% overall, as filed

Sanitary Fittings0%
Electrical Fittings0%
Staircases, Lifts Wells0%
Overhead and Underground Water Tanks.0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings2%
Slabs of Super Structure16%
Excavation95%
Basement(s) and Plinth100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

33 of 84 available
TypeArea sq mAvailable
3BHK996 of 8
2BHK783 of 14
3BHK973 of 5
3BHK1062 of 3
2BHK656 of 12
3BHK1061 of 1
3BHK990 of 1
3BHK1060 of 1
2BHK641 of 12
3BHK1082 of 9
2BHK756 of 14
2BHK641 of 2
2BHK651 of 1
2BHK651 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

Urbanscape Properties LLP

Limited Liability PartnershipPromoter type
Thiruvananthapuram, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
7Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
325 homes · 30 plotson the public record across 7 projects
60,289 sq mbuilt-up filed
9,751 sq mplotted area
21,263 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Thiruvananthapuram Municipal CorporationMunicipal Corporation4 of 7 projects
Manickal Grama PanchayatGrama Panchayat1 of 7 projects
Municipal Corporation ThiruvananthapuramLocal body (LSGI)this project1 of 7 projects
ThiruvananthapuramLocal body (LSGI)1 of 7 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
NALUMUKKU JN- PADIKKAVILAKOM TEMPLE ROAD
Village
KAZHAKOOTTAM
Taluk
THIRUVANANTHAPRUAM
District
Thiruvananthapuram
Pincode
695582
Survey no.
279/2-1
Patta no.
26845
What’s nearby
SchoolsNearest school 1.1km away · Library 568m away
HealthcareHospital 1.5km away · 2 clinics within 1km
LifestylePark 1.3km away
ShoppingSupermarket 1.1km away · Mall 1.7km away
Getting around
Expressway 1.7 km · Salem - Kochi - Kanyakumari RoadPrimary road 2.0 km · Kattaikonam - Chandavila - VetturoadRailway line 1.3 kmRailway station 2.1km away (Kazhakuttam)Limited bus connectivity nearby
Water & environment
Water body 254 m · Aswathy Gardens KalpanaCanal 904 m · Parvathy Puthanar
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Municipal Corporation Thiruvananthapuram

Local body (LSGI)
approved 2 Apr 2024 · 2 yrs ago
Building Permit no. BP/61/23Survey no. 279/2-1
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan BP/61/23 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

The local self-government (LSGI)

The local body that sanctioned this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.