Detailed Report

URMILA REGENCY

BRERAP00457-1/548/R-354/2019 · RERA Bihar · https://gethorizon.in/projects/urmila-regency-danapur-patna-u8b5k9fp

01

Complete project overview

RERA Bihar · Registration filing
Project name
URMILA REGENCY
Units
12 units
Unit mix
12 × 2 BHK
Parking
12 spaces
Land area
510 sq m
Built-up area
979 sq m

Timeline

Project startedMay 2017
RERA registeredJan 2019
Proposed completionJun 2019
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

12 units across 1 batch
BuildingTypeArea sq mCount
URMILA REGENCY2 BHK6512

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Bihar · Builder registration

GURUDEV INFRAHOMES PRIVATE LIMITED

CompanyPromoter type
Patna, BiharBased in
---Select---Also RERA-registered in
2Projects
1City
2019–2023Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
162 homeson the public record across 2 projects
20,977 sq mbuilt-up filed
9,520 sq mland declared
₹36.31 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from GURUDEV INFRAHOMES PRIVATE LIMITED— the full portfolio →

03

Location & price analysis

RERA Bihar · Registration filing
≈ area only · geocoded, verified but not exact · 25.5924, 85.0711 · © OpenStreetMap contributors
District
Patna
Anchal (block)
Danapur
Mauja (revenue village)
Dhanauta
Address
MAHUABAGH, DHANAUT, PHULWARI
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.4km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km · Convenience store within 1km
Getting around
Expressway 1.5 kmPrimary road 1.8 kmRailway line 755 mRailway station 1.1km away (Phulwari Sharif)Limited bus connectivity nearby
Water & environment
Water body 1.3 kmCanal 1.8 km · Barun Canal
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹2.44 Cr declared to build 12 flats. What that works out to:

₹20.33 Lakhdeclared cost per flatall-in — land + construction
₹2,315/sq ftof built-up area₹24,914/sq m
47%of the cost is land₹2,076/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Bihar Registration — Minimum Value Register

In Bihar it’s called the MVR (minimum value register) rate.

₹14,979per sq yd
₹17,915per sq m
Which rate
residential land, by road position
Matched to
The rate published for the village of “Dhanaut Mahuabagh”.
Highest rate
₹19,628 per sq yd — the top road-facing rate among the residential rates published for this village

By the road it faces

Res. Branch Road₹17,915 / sq m₹14,979 / sq yd
Res. Main Road₹23,475 / sq m₹19,628 / sq yd

The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.

What this number is — and isn’t

  • The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Bihar · Approved building plan
Building Permit

The promised possession date (30 Jun 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

362 residential projects still under way within 25 km. Step out ring by ring:

5 projects within 1 km — showing the nearest 5.

DHANAUTResidential/Group Housing

SIYARAM BISAKA ENCLAVE

SIYARAM ENGICONS LLP

May 2026registered
Feb 2030target completion
Declared cost₹9.88 CrAuthorityRERA Bihar
DanapurResidential/Group Housing

LALMATI DAMAS PALACE

DAMAS HOMES CREATION PRIVATE LIMITED

Apr 2022registered
Apr 2026target completion
Declared cost₹5.17 CrScale15 flatsAuthorityRERA Bihar
DanapurResidential/Group Housing

Keshwar Enclave

APNA ASHIANA BUILDCON PVT.LTD

Dec 2025registered
May 2030target completion
Declared cost₹8.05 CrScale32 flatsAuthorityRERA Bihar
TAHAL TOLAResidential/Group Housing

BASERA

SEVENIST INFRASTRUCTURE PRIVATE LIMITED

Mar 2023registered
Feb 2027target completion
Declared cost₹6.71 CrScale25 flatsAuthorityRERA Bihar
DanapurResidential/Group Housing

MALTI MAHESHWARI ENCLAVE

Srisatya Sai Homes Pvt. Ltd.

Sep 2024registered
May 2029target completion
Declared cost₹3.81 CrScale12 flatsAuthorityRERA Bihar

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Bihar does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Bihar does not publish a complaints register. This read cannot speak to them either way.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with RERA Bihar, as the builder submitted it.
  2. 02Builder's track record
    • RERA Bihar: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location & price analysis
    • Address, pincode and declared cost: the RERA Bihar filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the general area only, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • Bihar Registration — Minimum Value Register.
  5. 05Planning authority
    • RERA Bihar: the approved building plan, as filed.
  6. 06Complaints & litigation
    • RERA Bihar's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/urmila-regency-danapur-patna-u8b5k9fp.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.