HORIZON
Share

MALTI MAHESHWARI ENCLAVE

BRERAP00396-4/109/R-1758/2024 · RERA Bihar · https://gethorizon.in/projects/malti-maheshwari-enclave-danapur-patna-swhc7sz4

01

Complete project overview

RERA Bihar · Registration filing
Project name
MALTI MAHESHWARI ENCLAVE
Units
12 units
Unit mix
12 × 3 BHK
Parking
12 spaces
Land area
635 sq m
Built-up area
1,268 sq m

Timeline

Project startedMay 2024
RERA registeredSep 2024
Proposed completionMay 2029
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

12 units across 1 batch
BuildingTypeArea sq mCount
MALTI MAHESHWARI ENCLAVE3 BHK012

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Bihar · Builder registration

Srisatya Sai Homes Pvt. Ltd.

CompanyPromoter type
Patna, BiharBased in
---Select---Also RERA-registered in
5Projects
2Cities
2018–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
108 homeson the public record across 5 projects
13,454 sq mbuilt-up filed
5,928 sq mland declared
₹33.40 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
DANAPUR NAGAR PARISHADMunicipal / Corporation1 of 2 projects
Patna Municipal CorporationMunicipal / Corporationthis project1 of 2 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Srisatya Sai Homes Pvt. Ltd.— the full portfolio →

03

Location & price analysis

RERA Bihar · Registration filing
District
Patna
Anchal (block)
Danapur
Mauja (revenue village)
Dhanauta
Address
MAHUABAGH, DHANAUT, RUPASPUR, PATNA
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 823m away · Clinic within 2km
LifestylePark 1.9km away
ShoppingSupermarket 2.0km away
Getting around
Expressway 800 m · Bailey Road FlyoverPrimary road 2.4 km · Neora RoadRailway line 1.2 kmRailway station 1.7km away (Phulwari Sharif)Limited bus connectivity nearby
Water & environment
Canal 1.2 km · Barun CanalWater body 1.6 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹3.81 Cr declared to build 12 flats. What that works out to:

₹31.75 Lakhdeclared cost per flatall-in — land + construction
₹2,790/sq ftof built-up area₹30,037/sq m
36%of the cost is land₹1,988/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Bihar Registration — Minimum Value Register

In Bihar it’s called the MVR (minimum value register) rate.

₹14,979per sq yd
₹17,915per sq m
Which rate
residential land, by road position
Matched to
The rate published for “Dhanaut Mahuabagh”.
Highest rate
₹19,628 per sq yd — the top road-facing rate among the residential rates published for this locality

By the road it faces

Res. Branch Road₹17,915 / sq m₹14,979 / sq yd
Res. Main Road₹23,475 / sq m₹19,628 / sq yd

The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this locality.

What this number is — and isn’t

  • The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Bihar · Approved building plan

Patna Municipal Corporation

Municipal / Corporation
Building Permitapproved 5 Oct 2024 · 1 yr ago
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

See every project approved by RERA Bihar

07

Other projects nearby

The register · within 25 km

360 residential projects still under way within 25 km. Step out ring by ring:

Of the 937 projects the radar draws within 6 km — every kind, every stage — 265 are residential projects still under way. This list keeps only those, and looks further out.

3 projects within 1 km — showing the nearest 3.

710 m awayResidential

GULMOHAR ENCLAVE

ALPHA INFRASTRUCTURE · Patna

Apr 2024registered
Jan 2028target completion
Declared cost₹7.15 CrAuthorityRERA Bihar
760 m awayResidential/Group Housing

SIYARAM BISAKA ENCLAVE

SIYARAM ENGICONS LLP · DHANAUT · PATNA

May 2026registered
Feb 2030target completion
Declared cost₹9.88 CrAuthorityRERA Bihar
760 m awayResidential/Group Housing

LALMATI DAMAS PALACE

DAMAS HOMES CREATION PRIVATE LIMITED · Danapur · PATNA

Apr 2022registered
Apr 2026target completion
Declared cost₹5.17 CrScale15 flatsAuthorityRERA Bihar

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Bihar does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Bihar does not publish a complaints register. This read cannot speak to them either way.