HORIZON
Share

UTOPIA

P52100017622 · MahaRERA · https://gethorizon.in/projects/utopia-pimpri-chinchawad-m-haveli-jonecvzd

01

Complete project overview

MahaRERA · Registration filing
Units
95 units
Mix
80 × 2 BHK · 15 × 1 BHK
Carpet area
33–57 sq mper-unit range, as filed
Floors
13
Parking
118 spaces
Land area
3,950 sq m
Sanctioned built-up
3,391 sq m
Recreational open space
381 sq m

Timeline

RERA registeredAug 2018
Proposed completionDec 2022
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

95 units across 10 batches
TypeArea sq mCount
2 BHK493
2 BHK4227
2 BHK4827
2 BHK5112
1 BHK338
2 BHK421
1 BHK347
2 BHK571
2 BHK553
2 BHK516

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

SHARDA DEEPAK PANJABI

IndividualPromoter type
Pune, MAHARASHTRABased in
1Projects
1City
2018–2022Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Pimpri Chinchawad (M Corp.)
Taluka
Haveli
District
Pune
Pincode
412105
Survey no.
129
North boundary
PLOT NO 7
East boundary
G NO 130
South boundary
G NO 127
West boundary
PLOT NO 5-6
What’s nearby
Schools1 school within 1km
HealthcareHospital 720m away
LifestylePark 581m away · 8 restaurants and cafes within 1km · Swimming pool within 2km
ShoppingSupermarket 1.2km away · Bank 723m away
Getting around
Expressway 1.6 km · Pune Nashik RoadPrimary road 146 m · Spine RoadRailway line 4.5 kmMetro station 4.2km away (Pimpri Chinchwad Municipal Corporation (PCMC))Limited bus connectivity nearby
Water & environment
Water body 125 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹58,077per sq yd
₹69,460per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 103 divisions of “Pimpri Chinchawad (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹27,183₹1,50,076 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
06

Other projects nearby

The register · within 25 km

3,281 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,291 projects the radar draws within 6 km — every kind, every stage — 439 are residential projects still under way. This list keeps only those, and looks further out.

6 projects within 1 km — showing the nearest 6.

MoshiResidential / Group Housing

L Axis Phase III Cluster B

Pharande Promoters and Builders

Aug 2024registered
Mar 2031target completion
Government Guidance Rate₹43,679/sq ydScale163 flatsAuthorityMahaRERA
MoshiResidential / Group Housing

NB TOWERS

SHEKHAR INFRATECH

Sep 2023registered
Jun 2026target completion
Government Guidance Rate₹43,679/sq ydAuthorityMahaRERA
MoshiResidential / Group Housing

GURUKRUPA

CREATIVE REALTY

Feb 2023registered
Dec 2027target completion
Government Guidance Rate₹43,679/sq ydScale37 flatsAuthorityMahaRERA
PuneOthers

Samarth Classic

M/s Saste Patil Developers

Sep 2022registered
Dec 2026target completion
Government Guidance Rate₹58,077/sq ydScale70 flatsAuthorityMahaRERA
MoshiMixed

Silverise Grandsky Phase I

Silverise Grandsky LLP

Nov 2025registered
Jun 2029target completion
Government Guidance Rate₹43,679/sq ydScale51 flatsAuthorityMahaRERA
ChikhaliResidential / Group Housing

BHALCHANDRA IMPERIAL

MANGALAM GROUP

Oct 2024registered
Dec 2034target completion
Government Guidance Rate₹45,569/sq ydAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.