HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
26 units
Mix
16 × 1BHK · 8 × 1RK · 2 × 2BHK
Booked
26 of 26 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
767 sq m
Floor area
2,978 sq m
Description
VEEYEM PENTAGON

Timeline

Project startedJun 2022
RERA registeredOct 2022
Proposed completionDec 2026
TodayJul 2026
Construction progress

86% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc95%
Excavation100%
Basement(s) and Plinth100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

0 of 26 available
TypeArea sq mAvailable
2BHK410 of 2
1BHK230 of 2
1BHK240 of 2
1RK180 of 8
1BHK220 of 6
1BHK220 of 2
1BHK220 of 2
1BHK200 of 2

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

VEEYEM DEVELOPERS AND BUILDERS PRIVATE LIMITED

CompanyPromoter type
Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
2Projects
1Cities
2022–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
65 homeson the public record across 2 projects
7,213 sq mbuilt-up filed
1,546 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
KAKKANAD
Village
KAKKANAD
Taluk
Kanayannur
District
Ernakulam
Pincode
682037
Survey no.
540/4-2-4
Patta no.
15241
What’s nearby
Schools1 school within 500m · College or university 366m away · Library 2.0km away
HealthcareNearest hospital 2.0km away · 1 clinic within 1km · Pharmacy within 500m
LifestyleNo parks within 2km · Gym or sports centre 641m away · 23+ restaurants and cafes within 1km
ShoppingSupermarket 495m away · Convenience store within 1km · Bank 597m away
Getting around
Expressway 3.2 kmPrimary road 537 mRailway line 3.0 kmMetro station 2.3km away (InfoPark I Station)4 bus stops within 500m
Water & environment
Water body 464 mCanal 595 m
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Thrikkakara Municipality

Municipality
approved 5 Jul 2023 · 3 yrs ago
Building Permit no. TP2-BA-226/2021Survey no. 540/4-2-4
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan TP2-BA-226/2021 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Thrikkakara Municipality

Municipal corporation / municipality

Has approved 60 RERA projects3.9% of Kerala.

an apartments market92% apartments · 8% plotted layouts. Apartments like yours are this body's core business.

Builders
33
On record
4,257 flats · 86 plots
Since
2021

More apartment-heavy than Kerala overall — 92% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.