Complete project overview

K-RERA · Registration filing
Units
19 units
Mix
9 × 3BHK · 6 × 2BHK · 4 × 1BHK
Booked
7 of 19 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,521 sq m
Floor area
2,754 sq m
Description
VIKAS LNN

Timeline

RERA registeredAug 2024
Proposed completionJan 2028
TodayJul 2026
Construction progress

75% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings40%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings50%
Installation of lifts, water pumps etc50%
Electrical Fittings60%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

12 of 19 available
TypeArea sq mAvailable
3BHK1023 of 4
1BHK461 of 4
2BHK981 of 1
3BHK1164 of 4
2BHK833 of 5
3BHK1480 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

VIDHYA R

Thrissur, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2024–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
NELLAYI
Village
NELLAI
Taluk
MUKUNDAPURAM
District
Thrissur
Pincode
680305
Survey no.
33
Patta no.
5001 AND 6277
What’s nearby
Schools1 school within 1km
HealthcareHospital 1.4km away
LifestyleNo parks within 2km
ShoppingSupermarket 369m away
Getting around
Expressway 71 m · Salem - Kochi - Kanyakumari HighwayPrimary road 3.2 km · Kodakara - Kodungallur RoadRailway line 1.2 kmRailway station 1.2km away (Nellayi)Bus stop within 1km
Water & environment
Water body 77 m · Parayil Gopinathan Vaka KulamRiver 296 m · KurumaliCanal 677 m · Muriyad-Moorkanal Canal
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Parappukkara Grama Panchayat

Grama Panchayat
approved 6 Jan 2018 · 8 yrs ago
Building Permit no. A4-8969(85)17-18Survey no. 33
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan A4-8969(85)17-18 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Grama Panchayat

A village-level local self-government (LSGI) that issues the permit — Kerala's most common approving body. It has approved 268 RERA projects across 13 districts about 1 in 6 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.