HORIZON
Share

VINAYAK LAKE CITY

BRERAP189002010725300327E00 · RERA Bihar · https://gethorizon.in/projects/vinayak-lake-city-bara-bariyarpur-motihari-m5d960iq

01

Complete project overview

RERA Bihar · Registration filing
Project name
VINAYAK LAKE CITY
Units
27 units
Unit mix
27 × Duplex
Parking
27 spaces
Land area
2,703 sq m
Built-up area
2,149 sq m

Timeline

Project startedMar 2024
RERA registeredJul 2025
Proposed completionMar 2027
TodaySep 2026

Find your unit

Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.

27 units across 1 batch
BuildingTypeArea sq mCount
VINAYAK LAKE CITYDuplex1627

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Bihar · Builder registration

VISHWARAHI DEVELOPERS PRIVATE LIMITED

CompanyPromoter type
East Champaran, BiharBased in
---Select---Also RERA-registered in
1Projects
1City
2025–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Bihar · Registration filing
District
East Champaran
City / town
MOTIHARI
Anchal (block)
Motihari
Mauja (revenue village)
Bariyarpur
Village
BARA BARIYARPUR
Address
Ward no-43, khasra no-2567,2559, khata no-524,116
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 938m away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 880 mPrimary road 1.8 kmRailway line 2.3 kmRailway station 2.3km away (Motihari Court)Limited bus connectivity nearby
Water & environment
Water body 677 mRiver 2.0 km · Dhanauti
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹6.18 Cr declared to build 27 flats. What that works out to:

₹22.89 Lakhdeclared cost per flatall-in — land + construction
₹2,671/sq ftof built-up area₹28,755/sq m
55%of the cost is land₹1,168/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Bihar Registration — Minimum Value Register

In Bihar it’s called the MVR (minimum value register) rate.

₹5,165per sq yd
₹6,178per sq m
Which rate
residential land, by road position
Matched to
The rate published for the village of “Bariyarpur”.
Highest rate
₹8,264 per sq yd — the top road-facing rate among the residential rates published for this village

By the road it faces

Residential Land waskit₹6,178 / sq m₹5,166 / sq yd
Resential On Road Side₹9,884 / sq m₹8,264 / sq yd

The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.

What this number is — and isn’t

  • The minimum value Bihar’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Bihar · Approved building plan

NAGAR NIGAM MOTIHAR

Municipal / Corporation
Building Permit
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

2 residential projects still under way within 25 km. Step out ring by ring:

Of the 5 projects the radar draws within 6 km — every kind, every stage — 1 is a residential project still under way. This list keeps only those, and looks further out.

1 project between 3 and 6 km — showing the nearest 1.

4.4 km awayResidential/Group Housing

M.S. FAMILY VILLA

HEJAL HOMES OPC PRIVATE LIMITED · JAMLA · MOTIHARI

Jan 2026registered
Nov 2028target completion
Declared cost₹6.07 CrScale46 flatsAuthorityRERA Bihar

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Bihar does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Bihar does not publish a complaints register. This read cannot speak to them either way.