HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
70 units
Mix
30 × 1BHK · 24 × 2BHK · 16 × 1RK
Booked
70 of 70 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
2,145 sq m
Floor area
5,534 sq m
Description
VISHRAAM AANANDITA

Timeline

Project startedJan 2018
RERA registeredJul 2021
Proposed completionMay 2024
TodayJul 2026
Construction progress

84% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
The external plumbing and external plastering95%
Completion of terraces floor each building95%
Installation of lifts, water pumps etc95%
Fire Fighting Fittings and Equipment95%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc95%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings98%
Sanitary Fittings98%
Electrical Fittings98%
Staircases, Lifts Wells98%
Overhead and Underground Water Tanks.98%
Excavation100%
Basement(s) and Plinth100%
Slabs of Super Structure100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

0 of 70 available
TypeArea sq mAvailable
1RK290 of 16
2BHK630 of 8
1BHK400 of 16
2BHK610 of 8
2BHK550 of 8
1BHK400 of 14

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

VISHRAAM BUILDERS

PartnershipPromoter type
Thrissur, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
9Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
382 homes · 10 plotson the public record across 9 projects
55,761 sq mbuilt-up filed
2,553 sq mplotted area
16,645 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Thrissur Municipal CorporationMunicipal Corporation3 of 9 projects
Adat Grama PanchayatGrama Panchayat1 of 9 projects
CorporationLocal body (LSGI)1 of 9 projects
Corporation Office ThrissurLocal body (LSGI)1 of 9 projects
Municipal Office GuruvayoorLocal body (LSGI)this project1 of 9 projects
Thrissur CoporationLocal body (LSGI)1 of 9 projects
Thrissur Municipal CoprporationLocal body (LSGI)1 of 9 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Near Siva Temple
Village
GURUVAYUR
Taluk
Chavakkad
District
Thrissur
Pincode
680101
Survey no.
Survey No 84/1A-14 BLOCK 2
Patta no.
5404
What’s nearby
Schools2 schools within 1km · 3 educational institutions within 1km · College or university 1.5km away
HealthcareHospital 769m away · Pharmacy within 1km
LifestylePark 2.0km away · Gym or sports centre 1.6km away · 18+ restaurants and cafes within 1km
ShoppingSupermarket 1.1km away · Mall 2.0km away · Convenience store within 500m
Getting around
Expressway 1.7 km · Ponnani-Chavakkad-Kodungallur HighwayPrimary road 444 m · Guruvayoor - Althara - Ponnani RoadRailway line 1.4 kmRailway station 1.5km away (Guruvayur)Bus stop within 1km
Water & environment
Water body 62 m · Perumthatta Ambala Kulam
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Municipal Office Guruvayoor

Local body (LSGI)
approved 30 Jan 2017 · 9 yrs ago
Building Permit no. BA/300/10-11Survey no. Survey No 84/1A-14 BLOCK 2

The promised possession date (30 May 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan BA/300/10-11 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

The local self-government (LSGI)

The local body that sanctioned this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.