Complete project overview

K-RERA · Registration filing
Units
23 units
Mix
20 × 3BHK · 2 × DORMITORY · 1 × 2BHK
Booked
21 of 23 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,012 sq m
Floor area
4,556 sq m
Description
VISHRAAM SAROJ

Timeline

Project startedNov 2020
RERA registeredJul 2021
Proposed completionDec 2026
TodayJul 2026
Construction progress

87% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

2 of 23 available
TypeArea sq mAvailable
DORMITORY741 of 1
DORMITORY961 of 1
3BHK970 of 9
3BHK920 of 1
3BHK950 of 2
3BHK880 of 1
2BHK770 of 1
3BHK950 of 7

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

VISHRAAM BUILDERS

PartnershipPromoter type
Thrissur, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
9Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
382 homes · 10 plotson the public record across 9 projects
55,761 sq mbuilt-up filed
2,553 sq mplotted area
16,645 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Thrissur Municipal CorporationMunicipal Corporation3 of 9 projects
Adat Grama PanchayatGrama Panchayat1 of 9 projects
CorporationLocal body (LSGI)1 of 9 projects
Corporation Office ThrissurLocal body (LSGI)this project1 of 9 projects
Municipal Office GuruvayoorLocal body (LSGI)1 of 9 projects
Thrissur CoporationLocal body (LSGI)1 of 9 projects
Thrissur Municipal CoprporationLocal body (LSGI)1 of 9 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
SHORNUR ROAD
Village
THRISSUR
Taluk
Thrissur
District
Thrissur
Pincode
680001
Survey no.
Survey No 238/3, 238/3-1, 238/3-2 Block no 042
Patta no.
13239, 13240
What’s nearby
Schools2 schools within 1km · 4 educational institutions within 1km · College or university 679m away
HealthcareHospital 241m away · 3 clinics within 1km · Pharmacy within 500m
Lifestyle1 park within 500m · Gym or sports centre 554m away · 53+ restaurants and cafes within 1km
ShoppingSupermarket 213m away · Mall 205m away · Convenience store within 1km
Getting around
Expressway 4.9 km · NH-Service-RoadPrimary road 83 m · Swaraj RoundRailway line 653 mRailway station 952m away (Thrissur)7 bus stops within 500m
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Corporation Office Thrissur

Local body (LSGI)
approved 21 May 2020 · 6 yrs ago
Building Permit no. DW3/BA/418/18-19Survey no. Survey No 238/3, 238/3-1, 238/3-2 Block no 042
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan DW3/BA/418/18-19 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

The local self-government (LSGI)

The local body that sanctioned this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.