HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

VITHAI RESIDENCY

P52000049357 · MahaRERA · https://gethorizon.in/projects/vithai-residency-varasoli-alibag-7asub29k

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
25 units
Floors
5
Buildings
2
Parking
41 spaces
Land area
700 sq m
Sanctioned built-up
1,230 sq m

Timeline

RERA registeredFeb 2023
Proposed completionMar 2026
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

RAMCHANDRA PARSHURAM NAKATE

IndividualPromoter type
Raigarh, MAHARASHTRABased in
2Projects
2Cities
2021–2026Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
89 homeson the public record across 2 projects
3,842 sq mbuilt-up filed
3,120 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from RAMCHANDRA PARSHURAM NAKATE— the full portfolio →

03

Location

MahaRERA · Registration filing
≈ area only · geocoded, verified but not exact · 18.6605, 72.8759 · © OpenStreetMap contributors
Village
Varasoli
Taluka
Alibag
District
Raigarh
Pincode
402201
Survey no.
S NO 50 40VARSOLI
North boundary
S NO 1 2 6A 8 14 3 11 6B 6C 6D 13 3
East boundary
SURVEY NO 10
South boundary
ROAD
West boundary
S NO1 2 6A 18B 14A 116B 6C 6D 13A2
What’s nearby
SchoolsNo schools within 2km · College or university 2.0km away
HealthcareHospital 823m away · 1 clinic within 1km
LifestylePark 1.1km away
ShoppingNo supermarket within 2km
Getting around
Expressway 1.1 km · Alibag RoadPrimary road 300 m · Alibaug Rewas RoadRailway line 3.7 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 352 mRiver 1.7 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Collector Office Raigad

Collector office
Building Permit
Survey no. S NO 50 40VARSOLI

The promised possession date (31 Mar 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Collector Office Raigad

Planning authority

Has approved 9 RERA projects0% of Maharashtra.

an apartments market78% apartments · 22% plotted layouts. Apartments like yours are this body's core business.

Builders
9
On record
0 flats · 155 plots
Since
2017

More layout-heavy than Maharashtra overall — 22% plots here vs 5% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

100 residential projects still under way within 25 km. Step out ring by ring:

16 projects within 1 km — showing the nearest 6.

VarasoliResidential / Group Housing

Alibag Westend

ACORP

Mar 2022registered
Dec 2027target completion
Scale12 flatsAuthorityMahaRERA
ChendhreResidential / Group Housing

Alibag Paradise

ACORP

Mar 2022registered
Dec 2027target completion
Scale18 flatsAuthorityMahaRERA
ChendhreMixed

Shree Radha Krishna Residency

SHREE RADHA ENTERPRISES

Mar 2026registered
May 2027target completion
Scale32 flatsAuthorityMahaRERA
ChendhreResidential / Group Housing

Alibag Bliss

ACORP

Apr 2023registered
Dec 2029target completion
AuthorityMahaRERA
ChendhreResidential / Group Housing

Acons The Park Phase 1

Aarun Gulati

Oct 2024registered
Dec 2030target completion
Scale83 flatsAuthorityMahaRERA
ChendhreResidential / Group Housing

JANKI NIWAS

DWINETRA DEVELOPERS

Aug 2025registered
Jun 2027target completion
Scale17 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the general area only, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  5. 05Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  6. 06Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/vithai-residency-varasoli-alibag-7asub29k.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.