HORIZON
Share

Shree Radha Krishna Residency

PM1270002502883 · MahaRERA · https://gethorizon.in/projects/shree-radha-krishna-residency-chendhre-alibag-4r04uqcu

01

Complete project overview

MahaRERA · Registration filing
Units
32 units
Floors
7
Buildings
2
Parking
47 spaces
Land area
756 sq m
Sanctioned built-up
1,639 sq m

Timeline

RERA registeredMar 2026
Proposed completionMay 2027
TodaySep 2026
Construction progress
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Water conservation…0%
Internal finishes65%
Stairs & lifts65%
External finishes75%
Excavation85%
Plinth95%
Stilt floor100%
Superstructure100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

SHREE RADHA ENTERPRISES

PartnershipPromoter type
Raigarh, MAHARASHTRABased in
1Projects
1City
2026–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Chendhre
Taluka
Alibag
District
Raigarh
Pincode
402201
Survey no.
29/2/3
North boundary
Internal Road and Village road
East boundary
Survey No. 29/1 28 and 27 A
South boundary
Survey no 29/3
West boundary
Internal Road
What’s nearby
SchoolsNo schools within 2km · College or university 1.8km away
HealthcareHospital 585m away · 2 clinics within 1km
LifestylePark 916m away
ShoppingNo supermarket within 2km
Getting around
Expressway 888 m · Alibag RoadPrimary road 117 m · Alibaug Rewas RoadRailway line 4.0 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 454 mRiver 1.5 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

The Collector Of Raigad Alibag

Collector office
Building Permit
Survey no. 29/2/3
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

The planning authority

The body that approved this project. It has approved 4,607 RERA projects across 33 districts about 1 in 4 in Maharashtra.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

91 residential projects still under way within 25 km. Step out ring by ring:

Of the 103 projects the radar draws within 6 km — every kind, every stage — 33 are residential projects still under way. This list keeps only those, and looks further out.

17 projects within 1 km — showing the nearest 6.

140 m awayResidential / Group Housing

Alibag Bliss

ACORP · Chendhre · Alibag

Apr 2023registered
Dec 2029target completion
AuthorityMahaRERA
240 m awayResidential / Group Housing

Alibag Westend

ACORP · Varasoli · Alibag

Mar 2022registered
Dec 2027target completion
Scale12 flatsAuthorityMahaRERA
240 m awayResidential / Group Housing

Alibag Paradise

ACORP · Chendhre · Alibag

Mar 2022registered
Dec 2027target completion
Scale18 flatsAuthorityMahaRERA
380 m awayMixed

KARNIK SAGAR RESIDENCY

JAYANT KRISHNA SHETH · Chendhre · Alibag

Jul 2026registered
Mar 2030target completion
Scale25 flatsAuthorityMahaRERA
390 m awayResidential / Group Housing

JANKI NIWAS

DWINETRA DEVELOPERS · Chendhre · Alibag

Aug 2025registered
Jun 2027target completion
Scale17 flatsAuthorityMahaRERA
440 m awayResidential / Group Housing

Alibag Nirvana

ACORP · Chendhre · Alibag

Oct 2023registered
Dec 2029target completion
AuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.