HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

WILLA 25

TNRERA/11/BLG/0362/2025 · TNRERA · https://gethorizon.in/projects/willa-25-qy3pi557

01

Complete project overview

TNRERA · Registration filing
Description
Registration for Ground + 1 Floor Residential Building with 16 Dwelling Units at Ward - B, Block - 81 comprised in T. S. Nos.2/1, 2/2, 2/4, 2/5 of 049.Kavundampalayam Village, Coimbatore North Taluk, Coimbatore Corporation, Coimbatore District.
Registration no.
TNRERA/11/BLG/0362/2025

Timeline

RERA registeredOct 2025
Proposed completionOct 2030
TodaySep 2026
02

Builder’s track record

TNRERA · Builder registration

TRISQUARE PROPERTIES PRIVATE LIMITED

TRISQUARE PROPERTIES PRIVATE LIMITEDPromoter
1Projects
1Cities
2025–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

TNRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 21 new projects last year
  • 46 nearby projects
1 km radius · coordinates as filed · 11.0458, 76.9233 · © OpenStreetMap contributors
What’s nearby
SchoolsNearest school 1.3km away
HealthcareHospital 45m away · 2 clinics within 1km · Pharmacy within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km · Convenience store within 1km · Bank 856m away
Getting around
Expressway 2.6 km · Coimbatore-Mettupalayam RoadPrimary road 117 m · Thadagam RoadRailway line 3.1 kmRailway station 4.4km away (Coimbatore North)Bus stop within 1km
Water & environment
Water body 2.5 km
distances only — not a flood assessment
04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

A building already stood within ~40 m of the recorded location in 2016 — before this project started in 2025. The yearly view ends in 2023, so it does not cover this project's own construction; see the 2026 image.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~40 m of the filed location.

Satellite photographs of the same ground

Feb 2017
Apr 2023
Jan 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • A building is first visible in 2016.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
  • Site is a ~40 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
  • Coordinate could not be cross-checked against nearby filings.
  • The yearly site view ends in 2023, before this project started in 2025.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Tamil Nadu registration department

In Tamil Nadu it’s called the guideline value.

No government guidance rate is shown for this project.

Tamil Nadu publishes street-level guideline values; its full schedule isn't in Horizon's record yet.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Planning authority

TNRERA · Approved building plan

Town & Country Planning (DTCP)

Town & Country Planning (DTCP)
approved 31 Oct 2025 · 11 mo ago
Planning Permission no. 536/2025
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan 536/2025 on the approving authority’s portal to confirm the approval.

The approving body, at scale

Town & Country Planning (DTCP)

Town & country planning

Has approved 756 RERA projectsabout 1 in 5 in Tamil Nadu.

Builders
467
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by TNRERA

08

Other projects nearby

The register · within 25 km

119 residential and mixed-use projects still under way within 25 km. Step out ring by ring:

Of the 46 projects the radar draws within 6 km — every kind, every stage — 42 are residential and mixed-use projects still under way. This list keeps only those, and looks further out.

4 projects within 1 km — showing the nearest 4.

60 m away

WILLA 25

UNITD LIVING SPACE

Aug 2025registered
Jun 2033target completion
AuthorityTNRERA
550 m away

ATLANTIC CITY

TNCD LLP

Feb 2026registered
Dec 2030target completion
AuthorityTNRERA
680 m away

SAARA HOMES

CRYSTAL HOMES & C A Kurien

Sep 2025registered
Apr 2028target completion
AuthorityTNRERA
750 m away

MR RESIDENCY

JMJ HOUSING LIMITED

Jul 2024registered
Sep 2028target completion
AuthorityTNRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — TNRERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — TNRERA does not publish a complaints register. This read cannot speak to them either way.
  • Escrow — TNRERA does not publish escrow declarations. Whether buyer money is ring-fenced cannot be read here.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with TNRERA, as the builder submitted it.
  2. 02Builder's track record
    • TNRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the TNRERA filing.
    • Coordinates: as filed with TNRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • No government guidance rate could be matched to this project from Tamil Nadu's published schedules.
  6. 06Planning authority
    • TNRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  7. 07Complaints & litigation
    • TNRERA's public record lists no complaints or litigation for this project.
  8. 08Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/willa-25-qy3pi557.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.