HORIZON
Share

Zenith

PM1330002502207 · MahaRERA · https://gethorizon.in/projects/zenith-majiwade-thane-b8agfx1y

01

Complete project overview

MahaRERA · Registration filing
Units
88 units
Floors
22
Buildings
2
Parking
101 spaces
Land area
1,023 sq m
Sanctioned built-up
5,864 sq m

Timeline

RERA registeredJan 2026
Proposed completionDec 2030
TodaySep 2026
Construction progress
Excavation0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Street Lighting0%
Treatment And Disp…0%
Solid Waste Manage…0%
Water conservation…0%
Fire protection an…0%
Electrical meter r…0%
Open Parking0%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

SWAMIRAJ CONSTRUCTIONS PRIVATE LIMITED

CompanyPromoter type
Thane, MAHARASHTRABased in
1Projects
1City
2026–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Majiwade
Taluka
Thane
District
Thane
Pincode
400601
Survey no.
S.No. 210(pt), Sector No VI
North boundary
Bldg No 12
East boundary
Nallah
South boundary
Nallah
West boundary
30'0" wide road
What’s nearby
SchoolsNearest school 1.2km away · Library 521m away
HealthcareHospital 166m away · 2 clinics within 1km
LifestylePark 1.4km away · 5 restaurants and cafes within 1km
ShoppingSupermarket 293m away · Mall 1.0km away · Bank 256m away
Getting around
Expressway 99 m · Thane Ghodbunder RoadPrimary road 376 m · Lal Bahadur Shastri MargRailway line 670 mMetro station 1.1km away (Kapurbawdi Station)17 bus stops within 500m
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹1,26,841per sq yd
₹1,51,700per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Majiwade”.
In force
2026-2027 schedule
Spread
₹75,419₹1,61,540 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Thane Municipal Corporation

Municipal Corporation
Building Permit
Survey no. S.No. 210(pt), Sector No VI
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Thane Municipal Corporation

Municipal corporation

Has approved 489 RERA projects2.4% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
318
On record
7,890 flats · 0 plots
Reach
5 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

4,805 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,578 projects the radar draws within 6 km — every kind, every stage — 497 are residential projects still under way. This list keeps only those, and looks further out.

67 projects within 1 km — showing the nearest 6.

10 m awayResidential / Group Housing

Shyam B

RAJE BUILDERS & DEVELOPERS · Thane

Aug 2025registered
Dec 2028target completion
Government Guidance Rate₹60,034/sq ydScale56 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

Shivprabha CHS

Shreeman Balaji Infra · Majiwade · Thane

Mar 2026registered
Dec 2028target completion
Government Guidance Rate₹1,26,841/sq ydScale93 flatsAuthorityMahaRERA
140 m awayResidential / Group Housing

Lodha Quality Home Tower 7

MACROTECH DEVELOPERS LIMITED · Thane

Sep 2020registered
Mar 2026target completion
Government Guidance Rate₹60,034/sq ydScale217 flatsAuthorityMahaRERA
200 m awayOthers

ASHAR AXIS

Ms ASHAR VENTURES · Thane

Jan 2022registered
Dec 2026target completion
Government Guidance Rate₹60,034/sq ydScale312 flatsAuthorityMahaRERA
230 m awayOthers

MAHAVIR VISTA AND VISTA POINT

VINAYAK DEVELOPERS · Thane

Apr 2024registered
Dec 2028target completion
Government Guidance Rate₹60,034/sq ydScale394 flatsAuthorityMahaRERA
230 m awayOthers

Metro Regalia

SHREE ASHTAVINAYAK ENTERPRISES · Thane

Jul 2024registered
Dec 2027target completion
Government Guidance Rate₹60,034/sq ydScale105 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.