HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

909 ASHTAVINAYAK

P50500025407 · MahaRERA · https://gethorizon.in/projects/909-ashtavinayak-nagpur-m-corp-nagpur-urban-emxpj7fv

01

Complete project overview

MahaRERA · Registration filing
Project name
909 ASHTAVINAYAK
Units
36 units
Mix
32 × 1 BHK · 4 × 2 BHK
Carpet area
39–91 sq mper-unit range, as filed
Floors
12
Parking
1 spaces
Land area
859 sq m
Sanctioned built-up
1,786 sq m

Timeline

RERA registeredMay 2020
Proposed completionApr 2024
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

36 units across 9 batches
TypeArea sq mCount
1 BHK3910
2 BHK912
1 BHK495
1 BHK495
2 BHK902
1 BHK403
1 BHK503
1 BHK493
1 BHK393

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

A. A. CONSTRUCTIONS

PartnershipPromoter type
Nagpur, MAHARASHTRABased in
2Projects
2Cities
2020–2025Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
71 homeson the public record across 2 projects
3,043 sq mbuilt-up filed
2,116 sq mland declared
₹8.84 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from A. A. CONSTRUCTIONS— the full portfolio →

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 55 new projects last year
  • 715 nearby projects
exact address · geocoded from the filed address · 21.1387, 79.0634 · © OpenStreetMap contributors
Village
Nagpur (M Corp.)
Taluka
Nagpur (Urban)
District
Nagpur
Pincode
440010
Survey no.
909-356-112-SHEET NO 25
North boundary
HOUSE OF DR JAYANT KHER
East boundary
STRIP OF CONSERVANCY LANE
South boundary
HOUSE OF SHRI MUDLIAR
West boundary
9 MTR WIDE ROAD
What’s nearby
Schools1 school within 1km · College or university 935m away
HealthcareHospital 125m away · 2 clinics within 1km · Doctor's clinic within 1km
LifestylePark 1.3km away · Gym or sports centre 1.7km away · 10+ restaurants and cafes within 1km
ShoppingSupermarket 572m away · Mall 1.9km away · Bank 331m away
Getting around
Expressway 868 m · Amravati RoadPrimary road 368 m · West High Court RoadRailway line 2.4 km · Mumbai–Nagpur lineMetro station 329m away (Shankar Nagar Square)Limited bus connectivity nearby
Water & environment
Water body 348 mRiver 404 m · Naag
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹33,571per sq yd
₹40,150per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 84 divisions of “Nagpur (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹17,709₹86,288 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
06

Other projects nearby

The register · within 25 km

440 residential projects still under way within 25 km. Step out ring by ring:

Of the 715 projects the radar draws within 6 km — every kind, every stage — 220 are residential projects still under way. This list keeps only those, and looks further out.

26 projects within 1 km — showing the nearest 6.

60 m awayResidential / Group Housing

TATHASTU

KIRAN CONSTRUCTION · Nagpur

Aug 2022registered
Jun 2027target completion
Government Guidance Rate₹33,571/sq ydScale14 flatsAuthorityMahaRERA
60 m awayResidential / Group Housing

LE GRANDE ROYALE

VRINDAVAN CONSTRUCTIONS NAGPUR · Nagpur

Oct 2023registered
Oct 2027target completion
Government Guidance Rate₹33,571/sq ydScale60 flatsAuthorityMahaRERA
120 m awayResidential / Group Housing

Anand Bhawan

HI TECH INFRASTRUCTURE · Nagpur

Nov 2025registered
Dec 2028target completion
Government Guidance Rate₹33,571/sq ydScale14 flatsAuthorityMahaRERA
140 m awayResidential / Group Housing

MK ALTAMOUNT

M KULKARNI BUILDERS AND INFRASTRUCTURES PVT LIMITED · Nagpur

May 2023registered
Dec 2026target completion
Government Guidance Rate₹33,571/sq ydScale27 flatsAuthorityMahaRERA
260 m awayResidential / Group Housing

KALYANI SAMADHAN

Raghukul Constructions Private Limited · Nagpur

Jul 2024registered
Apr 2030target completion
Government Guidance Rate₹33,571/sq ydScale14 flatsAuthorityMahaRERA
340 m awayResidential / Group Housing

ELITE SPACE

GROWSPACE HOME INFRA · Nagpur

Mar 2023registered
Jun 2026target completion
Government Guidance Rate₹33,571/sq ydScale14 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the exact address.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • Maharashtra IGR — Annual Statement of Rates.
  5. 05Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  6. 06Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/909-ashtavinayak-nagpur-m-corp-nagpur-urban-emxpj7fv.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.