This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
Aakar Residency
Units
28 units
Mix
28 × 2 BHK
Carpet area
51–53 sq mper-unit range, as filed
Floors
8
Parking
2 spaces
Land area
742 sq m
Sanctioned built-up
1,903 sq m
Timeline
RERA registeredMar 2022
Proposed completionDec 2024
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
28 units across 5 batches
TypeArea sq mCount
2 BHK516
2 BHK536
2 BHK515
2 BHK526
2 BHK535
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Nagpur (M Corp.)
Taluka
Nagpur (Urban)
District
Nagpur
Pincode
440024
Survey no.
Survey No 275 Plot No 20 - 21 - 22 - 23 - 24 - 25
North boundary
9 Mtrs Wide Road
East boundary
9 Mtrs Wide Road
South boundary
9 Mtrs Wide Road
West boundary
Plot No 33 A and 33 B
What’s nearby
SchoolsNearest school 1.0km away · College or university 1.0km away · Library 1.4km away
HealthcareHospital 367m away · 15 clinics within 1km · Pharmacy within 500m
LifestylePark 1.6km away · Gym or sports centre 1.3km away · 6 restaurants and cafes within 1km
ShoppingSupermarket 405m away · Mall 1.9km away · Convenience store within 500m
Getting around
Expressway 518 m · Ring RoadPrimary road 2.0 kmRailway line 1.5 kmRailway station 2.6km away (Ajni)Limited bus connectivity nearby
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹33,571per sq yd
₹40,150per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 84 divisions of “Nagpur (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹17,709 – ₹86,288 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Nagpur Improvement Trust
Building Permit
Survey no. Survey No 275 Plot No 20 - 21 - 22 - 23 - 24 - 25
The promised possession date (31 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Nagpur Improvement Trust
Planning authority
Has approved 109 RERA projects — 0.5% of Maharashtra.
an apartments market — 95% apartments · 5% plotted layouts. Apartments like yours are this body's core business.
Builders
93
On record
2,588 flats · 759 plots
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
441 residential projects still under way within 25 km. Step out ring by ring:
Of the 762 projects the radar draws within 6 km — every kind, every stage — 234 are residential projects still under way. This list keeps only those, and looks further out.
2 projects within 1 km — showing the nearest 2.
180 m awayResidential / Group Housing
Ibrahim Residency
Mohammed Fahim Ibrahim · Nagpur
3 yr 9 mo
Nov 2023registered
Aug 2027target completion
Government Guidance Rate₹33,571/sq ydScale40 flatsAuthorityMahaRERA