BELVEDERE
URBAN CONCEPT REALTY LLP · North Goa
ADWALPALKARS SKYLINE
Timeline
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
More from ADWALPALKAR CONSTRUCTIONS AND RESORTS PVT LTD— the full portfolio →
In Goa it’s called the notified land rate.
No government guidance rate is shown for this project.
Goa notifies its land rates taluka by taluka, and this project doesn't name the ward or survey number the order prices — so no figure is shown rather than a neighbouring zone's.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The promised possession date (31 Mar 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Not published. RERA Goa doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
Only what the builder declared, or what RERA Goa records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Goa, or that this register doesn’t publish it — never that nothing happened.
141 residential projects still under way within 25 km. Step out ring by ring:
Of the 62 projects the radar draws within 6 km — every kind, every stage — 22 are residential projects still under way. This list keeps only those, and looks further out.
5 projects between 1 and 3 km — showing the nearest 5.
URBAN CONCEPT REALTY LLP · North Goa
Priority Constructions · North Goa
ADWALPALKAR CONSTRUCTIONS · North Goa
Emgee Housing Private Limited · North Goa
D PAL BUILDCON PRIVATE LIMITED · North Goa
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you