Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
12 units across 1 batch
TypeArea sq mCount
Residential9912
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Complete project overview — done
02
Builder’s track record
GujRERA · Builder registration
SUHAIL MAHMMAD ABDULRAHEMAN GHOGHARI PROP OF GHOGHARI INFRASTRUCTURE
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
B/H SAMRAT HOTELNR CITY PULSE CINEMA SARKHEJ-JUHAPURA MAIN ROAD
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 752m away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 1.2 kmPrimary road 80 m · Jawaharlal Nehru RoadRailway line 1.0 kmRailway station 1.3km away (Sarkhej)Limited bus connectivity nearby
Water & environment
Water body 502 m · Sarkej RozaCanal 1.7 km
distances only — not a flood assessment
Land, title & encumbrance
MortgageLoan outstanding · ₹1.31 Cr outstanding
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price
₹3.01 Cr declared to build 12 flats. What that works out to:
₹30.00 Lakh – ₹50.00 Lakhdeclared unit pricerange on the filing — not a live asking price
₹25.07 Lakhdeclared cost per flatall-in — land + construction
₹2,348/sq ftof carpet area₹25,269/sq m
17%of the cost is land₹924/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
A building already stood on the plot in 2016 (about 6 m), 20 m in 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is the plot the promoter drew.
Satellite photographs of the same ground
Mar 2017Mar 2023Mar 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2016 — and something already stood here in 2016, so this may be a redevelopment.
Plot outline was drawn by the promoter on the RERA portal and can be misplaced - check it against the image.
Coordinate checked only against its district, not its pincode.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Gujarat Revenue Department — Annual Statement of Rates (jantri), 2011
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
₹8,905per sq yd
₹10,650per sq m
Which rate
land + construction: residential flat
Matched to
The rate published for “SARKHEJ”.
In force
2011 schedule
Spread
₹3,345 – ₹21,739 per sq yd across the places it was taken over
This filing declares ₹25,269 per sq m of carpet area — 2.37× the government figure. Declared cost is land and construction; the government guidance rate is what the state will not register a sale below. Neither is a sale price.
What this number is — and isn’t
The minimum value Gujarat’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
06
Planning authority
GujRERA · Approved building plan
Ahmedabad Urban Development Authority
Urban Development Authority
Building Permitapproved 10 Mar 2021 · 5 yrs ago
The promised possession date (31 Dec 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
Building-Use (BU) permission — the occupancy sign-off, on record
All 1 block carry a Building-Use (BU) permission (latest 11 Oct 2022)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.
The approving body, at scale
Ahmedabad Urban Development Authority
Urban Development Authority
Has approved 2,400 RERA projects — about 1 in 7 in Gujarat.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
1,936
On record
3,12,468 flats · 1,153 plots
Reach
22 talukas
Since
2007
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to GujRERA
Litigation
None declared in this filing
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
2,466 residential projects still under way within 25 km. Step out ring by ring:
Of the 882 projects the radar draws within 6 km — every kind, every stage — 323 are residential projects still under way. This list keeps only those, and looks further out.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
Gujarat Revenue Department — Annual Statement of Rates (jantri), 2011.
06Planning authority
GujRERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
GujRERA's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/alif-1-appartment-ahmedabad-city-pfkgvwns.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.