• In proposed project, currently total no. of 11 floors (including Basement, Stilt & 9 floor) are sanctioned vide letter dated 21-12-2021 by UIT, Bhilwara against total planned 12 floors(including Basement, Stilt & 10 floor) in this project. The promoter intends to obtain permission from the competent authority for remaining floor in the future & will intimate Raj. RERA Authority as & when the permission is obtained. Promoter will construct extra 1 (one) floor only if necessary permission from concerned authority is received before completion of project.
• We have uploaded floor plan, elevation & section drawings proposed by the architect for development of 10th floor in the project for which the approval needs to be taken from the competent authority.
• We have updated no. of floors & GBUA of B+S+10 in project profile & paid additional RERA Registration Fee for development of one more floor if the same is approved by competent authority (GBUA of B+S+9 is 11322.40 sq. mtr. & GBUA of B+S+10 is 12296.62 sq. mtr)
Timeline
Construction startJan 2022
RERA registeredJan 2022
Proposed completionDec 2025
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Plot No.5 of Aarji No. 462,481, Near Aavari Mata Mandir, Biliya, Bhilwara, Bhilwara, Bhilwara, 311001
Village
Bhilwara
Taluka
Bhilwara
District
Bhilwara
Pincode
311001
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 937m away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 745 mPrimary road 140 mRailway line 4.3 kmRailway station 4.5km away (Bhilwara)Limited bus connectivity nearby
Price analysisdeclared build cost — not a sale price
₹21.30 Cr declared to build 79 flats. What that works out to:
₹26.96 Lakhdeclared cost per flatall-in — land + construction
₹1,609/sq ftof built-up area₹17,322/sq m
6%of the cost is land₹445/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 25 Jan 2022 · 4 yrs ago
The promised possession date (15 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
8 residential projects still under way within 25 km. Step out ring by ring:
Of the 72 projects the radar draws within 6 km — every kind, every stage — 6 are residential projects still under way. This list keeps only those, and looks further out.