HORIZON
Share

Arch Manorath

P51500021053 · MahaRERA · https://gethorizon.in/projects/arch-manorath-aurangabad-m-corp-c3c8vvze

01

Complete project overview

MahaRERA · Registration filing
Units
49 units
Mix
49 × 2 BHK
Carpet area
41–48 sq mper-unit range, as filed
Floors
7
Land area
1,109 sq m
Sanctioned built-up
1,550 sq m

Timeline

RERA registeredMay 2019
Proposed completionDec 2026
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

49 units across 12 batches
TypeArea sq mCount
2 BHK465
2 BHK425
2 BHK415
2 BHK425
2 BHK427
2 BHK461
2 BHK481
2 BHK462
2 BHK464
2 BHK484
2 BHK455
2 BHK455

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

Kamalleela Developers

PartnershipPromoter type
Aurangabad, MAHARASHTRABased in
1Projects
1City
2019–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Aurangabad (M Corp.)
Taluka
Aurangabad
District
Aurangabad
Pincode
431001
Survey no.
Plot no. 2
North boundary
15 meter wide DP Road
East boundary
Remaining land of gut no 107
South boundary
Plot no 3
West boundary
6 meter wide road
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 2.5km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 205 m · Padegaon RoadPrimary road 3.9 km · University RoadRailway line 2.0 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 2.9 km · Tisgaon ReservoirRiver 3.1 km · Shivna River
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

339 residential projects still under way within 25 km. Step out ring by ring:

Of the 217 projects the radar draws within 6 km — every kind, every stage — 69 are residential projects still under way. This list keeps only those, and looks further out.

1 project within 1 km — showing the nearest 1.

30 m awayOthers

Arch Nikunj

ARCH DEVELOPERS · Aurangabad

Oct 2018registered
Dec 2026target completion
Scale34 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.