01

Complete project overview

RERA Bihar · Registration filing
Project name
Ashirwad Rose Valley
Units
472 units
Unit mix
353 × 3 BHK · 55 × 1 BHK · 44 × 2 BHK · 20 × Shop
Parking
452 spaces
Land area
9,647 sq m
Built-up area
36,063 sq m

Timeline

Project startedApr 2019
Proposed completionDec 2021
RERA registeredMay 2023
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

472 units across 6 batches
BuildingTypeArea sq mCount
Ashirwad Rose ValleyShop328
Ashirwad Rose ValleyShop398
Ashirwad Rose ValleyShop684
Ashirwad Rose Valley3 BHK0353
Ashirwad Rose Valley2 BHK1144
Ashirwad Rose Valley1 BHK555

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Bihar · Builder registration

ASHIRWAD ENGICON PRIVATE LIMITED

CompanyPromoter type
Patna, BiharBased in
---Select---Also RERA-registered in
7Projects
2Cities
2018–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
2,357 homeson the public record across 7 projects
2,01,751 sq mbuilt-up filed
64,001 sq mland declared
₹455.72 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from ASHIRWAD ENGICON PRIVATE LIMITED— the full portfolio →

03

Location & price analysis

RERA Bihar · Registration filing
District
Patna
City / town
Patna
Anchal (block)
Patna Sadar
Mauja (revenue village)
Nasirpur Tajpur
Address
Mauza-Nasirpur, Tajpur, Khata No.: 67, 209, 233, 86
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 4.0km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 347 mPrimary road 126 mRailway line 218 m · Howrah - Delhi RailwayRailway station 2.4km away (Patna Ghat)Limited bus connectivity nearby
Water & environment
Water body 1.5 km · GangesRiver 1.9 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹96.72 Cr declared to build 472 flats. What that works out to:

₹20.49 Lakhdeclared cost per flatall-in — land + construction
₹2,492/sq ftof built-up area₹26,820/sq m
17%of the cost is land₹1,610/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Bihar registration department

In Bihar it’s called the MVR (minimum value register) rate.

No government guidance rate is shown for this project.

Bihar's Minimum Value Register is in Horizon's record, but this project's mauja couldn't be tied to one thana — or its thana prices land by the katha, a unit whose size differs from district to district, so converting it would be a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

RERA Bihar · Approved building plan
Building Permit

The promised possession date (31 Dec 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

348 residential projects still under way within 25 km. Step out ring by ring:

Of the 29 projects the radar draws within 6 km — every kind, every stage — 18 are residential projects still under way. This list keeps only those, and looks further out.

2 projects within 1 km — showing the nearest 2.

890 m awayResidential/Group Housing

MAURYA CRYSTAL PARADISE

MAURYA VIHAR INFRA PVT LTD · DIDARGANJ · PATNA

Sep 2025registered
Dec 2030target completion
Declared cost₹14.00 CrScale42 flatsAuthorityRERA Bihar
970 m awayResidential/Group Housing

Star Galaxy-I Phase-II

Sai Shree Balajee Homes Pvt. Ltd. · Patna Sadar · PATNA

Apr 2023registered
Dec 2027target completion
Declared cost₹76.00 CrScale259 flatsAuthorityRERA Bihar

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Bihar does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Bihar does not publish a complaints register. This read cannot speak to them either way.