HORIZON
Share

Audumbar Green A Wing

P52100054752 · MahaRERA · https://gethorizon.in/projects/audumbar-green-a-wing-tathwade-mulshi-ygsotygb

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
35 units
Floors
8
Buildings
2
Parking
40 spaces
Land area
1,700 sq m
Sanctioned built-up
1,397 sq m

Timeline

RERA registeredFeb 2024
Proposed completionApr 2026
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

Alankar Bagal Group

PartnershipPromoter type
Pune, MAHARASHTRABased in
1Projects
1City
2024–2026Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Tathwade
Taluka
Mulshi
District
Pune
Pincode
411033
Survey no.
S. No./Gat No. 27/1A/1 (P), Near Nimbalkar Nagar, Opp to Tata Steel Yard, Tathawade, Tal Mulshi, Dist. Pune 411033
North boundary
By remaining property fromSurvey No 27
East boundary
By Road and Survey No 25
South boundary
By remaining property fromSurvey No 27
West boundary
By remaining property fromSurvey No 27
What’s nearby
Schools1 school within 1km
HealthcareHospital 515m away · 2 clinics within 1km
LifestyleNo parks within 2km · Gym or sports centre 551m away · 8 restaurants and cafes within 1km
ShoppingSupermarket 499m away · Bank 981m away
Getting around
Expressway 1.4 kmPrimary road 171 m · Shree Chatrapati Shivaji Maharaj FlyoverRailway line 3.1 km · Mumbai–Pune RailwayMetro station 3.1km away (Wakad Chowk metro Station)Limited bus connectivity nearby
Water & environment
Water body 625 m · silver jym swimming poolRiver 973 m · Pavana River
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹58,805per sq yd
₹70,330per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Tathwade”.
In force
2026-2027 schedule
Spread
₹38,537₹71,715 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Pimpri Chinchwad Municipal Corporation

Municipal Corporation
Building Permit
Survey no. S. No./Gat No. 27/1A/1 (P), Near Nimbalkar Nagar, Opp to Tata Steel Yard, Tathawade, Tal Mulshi, Dist. Pune 411033

The promised possession date (30 Apr 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Pimpri Chinchwad Municipal Corporation

Municipal corporation

Has approved 1,391 RERA projectsabout 1 in 14 in Maharashtra.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
1,080
On record
9,009 flats · 249 plots
Reach
2 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,174 residential projects still under way within 25 km. Step out ring by ring:

20 projects within 1 km — showing the nearest 6.

TathwadeResidential / Group Housing

SOHAM SRUSHTI

SOHAM DEVELOPERS

Mar 2024registered
Dec 2026target completion
Government Guidance Rate₹58,805/sq ydScale56 flatsAuthorityMahaRERA
TathwadeOthers

SILVER METEOR

Roshan Builders LLP

May 2024registered
Dec 2028target completion
Government Guidance Rate₹58,805/sq ydScale571 flatsAuthorityMahaRERA
TathwadeOthers

NIRMAN COSMOPOLIS

Realcon Properties LLP

Jun 2023registered
Dec 2030target completion
Government Guidance Rate₹58,805/sq ydScale554 flatsAuthorityMahaRERA
TathwadeResidential / Group Housing

The Enclave 1

NIRMAN ESTATE

Jan 2024registered
Dec 2030target completion
Government Guidance Rate₹58,805/sq ydScale42 flatsAuthorityMahaRERA
TathwadeOthers

NIRMAN ASTROPOLIS

NIRMAN ESTATE

Nov 2022registered
Dec 2030target completion
Government Guidance Rate₹58,805/sq ydScale475 flatsAuthorityMahaRERA
Pimpri ChinchawadResidential / Group Housing

NARMADA

MORAYA ASSOCIATES

May 2024registered
Jun 2027target completion
Government Guidance Rate₹58,077/sq ydAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.