Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
GRAM DEWAS SENIOR, SURVEY NUMBER 315/2/3, 318/2, ZILA DEWAS
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 692m away · 2 clinics within 1km
LifestyleNo parks within 2km
ShoppingSupermarket 926m away · Bank 901m away
Getting around
Expressway 2.2 km · Dewas BypassPrimary road 694 mRailway line 1.5 km · DWX - INDB Rail SectionRailway station 1.9km away (Dewas Junction)Limited bus connectivity nearby
Water & environment
Water body 1.2 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹98.53 Lakh declared to build 27 plots. What that works out to:
₹3.65 Lakhdeclared cost per plotall-in — land + construction
20%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
MP Department of Registration & Stamps
In Madhya Pradesh it’s called the collector guideline rate.
₹5,518per sq yd
₹6,600per sq m
Which rate
open plot, residential
Matched to
The rate published for “MUKRBA (DEWAS JUNIOR)”, 50 m from this project.
In force
2026-2027 schedule · effective Apr 2026
Colonies around this project
KATI GHATI (DEWAS SENIOR)
₹5,300 / sq m
₹4,431 / sq yd
100 m
KHARI BAWDI (DEWAS JUNIOR)
₹6,200 / sq m
₹5,184 / sq yd
110 m
MUKATI MARG PURANI JAIL SE AAGE (DEWAS JUNIOR OR DEWAS SENIAR)
₹6,400 / sq m
₹5,351 / sq yd
130 m
HANUMAN BAKHAL (DEWAS SENIOR)
₹5,300 / sq m
₹4,431 / sq yd
170 m
GANJABANG CHORAHE SE SENIOR RAJBADE TAK (DEWAS SENIOR)
₹14,400 / sq m
₹12,040 / sq yd
180 m
The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.
What this number is — and isn’t
The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of colony, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RERA Madhya Pradesh · Approved building plan
Dewas
Town & Country Planning (DTCP)
Layout Permitapproved 18 May 2026 · 4 mo ago
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Dewas
Town & Country Planning area · Dewas district
Has approved 135 RERA projects — 2.5% of Madhya Pradesh.
a plotted-layout market — 5% apartments · 95% plotted layouts. Your plotted layout is this body's core business.
Builders
111
On record
386 flats · 13,483 plots
Reach
8 tehsils
Since
2017
More layout-heavy than Madhya Pradesh overall — 95% plots here vs 72% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Madhya Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Madhya Pradesh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Madhya Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Madhya Pradesh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
207 plotted projects still under way within 25 km. Step out ring by ring:
Of the 97 projects the radar draws within 6 km — every kind, every stage — 57 are plotted projects still under way. This list keeps only those, and looks further out.