HORIZON
Share

CIDBI CANDOR

T1/OL/469/2021 · K-RERA · https://gethorizon.in/projects/cidbi-candor-thrissur-34k75hb1

01

Complete project overview

K-RERA · Registration filing
Project name
CIDBI CANDOR
Units
44 units
Mix
21 × 3BHK · 12 × O · 11 × 2BHK
Booked
44 of 44 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,499 sq m
Floor area
5,543 sq m
Description
CIDBI CANDOR

Timeline

Project startedFeb 2021
RERA registeredJul 2021
Proposed completionDec 2025
TodaySep 2026
Construction progress

86% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Fire Fighting Fittings and Equipment95%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc95%
Sanitary Fittings98%
Electrical Fittings98%
Excavation100%
Basement(s) and Plinth100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

0 of 44 available
TypeArea sq mAvailable
3BHK920 of 10
2BHK720 of 10
2BHK770 of 1
O840 of 11
3BHK1010 of 11
O1370 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

A A ABDUL LATHIF

Thrissur, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
3Projects
1Cities
2021–2025Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
134 homeson the public record across 3 projects
19,357 sq mbuilt-up filed
4,838 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Thrissur Municipal CorporationMunicipal Corporationthis project2 of 3 projects
Thrissur Municipal CoroporationLocal body (LSGI)1 of 3 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from A A ABDUL LATHIF— the full portfolio →

03

Location

K-RERA · Registration filing
Street
POONKUNNAM
Village
THRISSUR
Taluk
Thrissur
District
Thrissur
Pincode
680002
Survey no.
1873/3-1, 1873/4, 1873/3, 1873/8,1873/9
Patta no.
12510/N, 4084,13382, 4231
What’s nearby
Schools1 school within 500m · 7 educational institutions within 1km · College or university 1.3km away
HealthcareHospital 993m away · 3 clinics within 1km · Pharmacy within 500m
LifestylePark 982m away · Gym or sports centre 1.4km away · 13+ restaurants and cafes within 1km
ShoppingSupermarket 142m away · Mall 1.0km away · Bank 67m away
Getting around
Primary road 8 m · Thrissur – Kuttippuram RoadRailway line 858 mRailway station 828m away (Punkunnam)Bus stop within 500m
Water & environment
Water body 340 m · Seetharam Mill Kulam
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Government Guidance Rate

Kerala Registration Department — fair value

In Kerala it’s called the fair value.

₹54,522per sq yd
₹65,208per sq m
Which rate
Residential Plot with Corp./Mun./Panch. road access
Matched to
The value published for this project's own survey number, in “Thrissur”.

What this number is — and isn’t

  • The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
05

Planning authority

K-RERA · Approved building plan

Thrissur Municipal Corporation

Municipal Corporation
approved 7 Jul 2021 · 5 yrs ago
Building Permit no. KKY/BA/245/20-21Survey no. 1873/3-1, 1873/4, 1873/3, 1873/8,1873/9

The promised possession date (20 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan KKY/BA/245/20-21 on the approving authority’s portal to confirm the approval.

The approving body, at scale

Thrissur Municipal Corporation

Municipal corporation / municipality

Has approved 91 RERA projectsabout 1 in 17 in Kerala.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
51
On record
5,515 flats · 15 plots
Since
2021

More apartment-heavy than Kerala overall — 99% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by K-RERA

07

Other projects nearby

The register · within 25 km

78 residential projects still under way within 25 km. Step out ring by ring:

2 projects within 1 km — showing the nearest 2.

THRISSURResidential (Apartment)

FORUS GAZANIA

FORUS INITIATIVES

Jun 2021registered
Dec 2027target completion
Government Guidance Rate₹44,148/sq ydScale44 flatsAuthorityK-RERA
THRISSURResidential (Apartment)

VISHRAAM CITYLITE

VISHRAAM BUILDERS

Sep 2024registered
Dec 2028target completion
Government Guidance Rate₹54,522/sq ydScale24 flatsAuthorityK-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.