Complete project overview

K-RERA · Registration filing
Project name
CREDENCE APARTMENT
Units
62 units
Mix
36 × 2BHK · 22 × 3BHK · 4 × 4BHK
Booked
62 of 62 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
2,125 sq m
Floor area
10,242 sq m
Description
CREDENCE APARTMENT

Timeline

Project startedFeb 2017
Proposed completionAug 2020
RERA registeredNov 2021
TodaySep 2026
Construction progress

88% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

0 of 62 available
TypeArea sq mAvailable
3BHK1080 of 11
2BHK790 of 11
2BHK640 of 11
2BHK830 of 11
4BHK1630 of 4
2BHK940 of 1
2BHK850 of 1
2BHK850 of 1
3BHK1120 of 7
3BHK1250 of 4

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

A A ABDUL LATHIF

Thrissur, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
3Projects
1Cities
2021–2025Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
134 homeson the public record across 3 projects
19,357 sq mbuilt-up filed
4,838 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Thrissur Municipal CorporationMunicipal Corporation2 of 3 projects
Thrissur Municipal CoroporationLocal body (LSGI)this project1 of 3 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from A A ABDUL LATHIF— the full portfolio →

03

Location

K-RERA · Registration filing
Street
EVER GREEN ROAD
Village
CHEMBUKAVU
Taluk
Thrissur
District
Thrissur
Pincode
680001
Survey no.
687/1,687/8,687/5
Patta no.
5623/1025
What’s nearby
Schools2 schools within 1km · 3 educational institutions within 1km · College or university 246m away
HealthcareHospital 398m away · 2 clinics within 1km · Pharmacy within 500m
LifestylePark 1.4km away · Gym or sports centre 773m away · 23+ restaurants and cafes within 1km
ShoppingSupermarket 300m away · Mall 217m away · Bank 291m away
Getting around
Expressway 3.1 km · Salem - Kochi - Kanyakumari HighwayPrimary road 294 m · Thrissur - Mannuthy RoadRailway line 2.4 kmRailway station 2.4km away (Thrissur)6 bus stops within 500m
Water & environment
Water body 155 mCanal 726 m
distances only — not a flood assessment
04

Government Guidance Rate

Kerala Registration Department — fair value

In Kerala it’s called the fair value.

₹38,166per sq yd
₹45,646per sq m
Which rate
Residential Plot with Corp./Mun./Panch. road access
Matched to
The value published for this project's own survey number, in “Chembukkavu”.

What this number is — and isn’t

  • The minimum value Kerala’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
05

Planning authority

K-RERA · Approved building plan

Thrissur Municipal Coroporation

Local body (LSGI)
approved 21 Jul 2016 · 10 yrs ago
Building Permit no. DW3/BA/98/2015-16Survey no. 687/1,687/8,687/5

The promised possession date (28 Aug 2020) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan DW3/BA/98/2015-16 on the approving authority’s portal to confirm the approval.

The approving body, at scale

The local self-government (LSGI)

The local body that approved this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

78 residential projects still under way within 25 km. Step out ring by ring:

Of the 124 projects the radar draws within 6 km — every kind, every stage — 60 are residential projects still under way. This list keeps only those, and looks further out.

5 projects within 1 km — showing the nearest 5.

CHIYYARAMResidential (Apartment)

KMP Suvarnabhoomi

Parameswaran Kizhakkemadathil Mahadeva Iyyer

May 2024registered
Mar 2028target completion
Government Guidance Rate₹11,450/sq ydScale30 flatsAuthorityK-RERA
CHEMBUKAVUResidential (Apartment)

JOYALUKKAS GOLD TOWER,THRISSUR

MASAAKI DEVELOPERS PRIVATE LIMITED

Mar 2026registered
Jun 2030target completion
Government Guidance Rate₹19,083/sq ydScale131 flatsAuthorityK-RERA
CHEMBUKAVUResidential (Apartment)

SKYLINE CITY LIGHT

M/s Skyline Builders

Feb 2023registered
Feb 2028target completion
Government Guidance Rate₹21,809/sq ydScale40 flatsAuthorityK-RERA
OLLUKKARAResidential (Apartment)

HI LIFE INSPIRE

HiLife Builders Pvt Ltd

May 2024registered
Jun 2029target completion
Government Guidance Rate₹5,518/sq ydScale52 flatsAuthorityK-RERA
NADATHARAResidential (Apartment)

PB JAHNVI

PB HOMES PVT LTD

Sep 2024registered
Apr 2030target completion
Government Guidance Rate₹1,020/sq ydScale81 flatsAuthorityK-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.