HORIZON
Share

DIVA ANTILIA

P52000007868 · MahaRERA · https://gethorizon.in/projects/diva-antilia-karade-kh-panvel-vn2jn9un

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
DIVA ANTILIA
Units
182 units
Mix
96 × 1 BHK · 36 × 2 BHK · 25 × Shop · 25 × Office
Carpet area
22–65 sq mper-unit range, as filed
Floors
9
Buildings
4
Parking
16 spaces
Land area
5,400 sq m
Sanctioned built-up
6,912 sq m
Recreational open space
507 sq m

Timeline

RERA registeredAug 2017
Proposed completionDec 2022
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

182 units across 25 batches
TypeArea sq mCount
2 BHK4024
1 BHK2828
1 BHK3412
1 BHK2514
1 BHK2542
Shop404
Shop272
Office225
Office324
Office311
Shop265
Office651
Office221
Shop581
2 BHK4012
Shop265
Office225
Office334
Office301
Shop404
Shop271
Shop381
Shop322
Office611
Office262

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

DEEP SAGAR ENTERPRISES

PartnershipPromoter type
Thane, MAHARASHTRABased in
1Projects
1City
2017–2022Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Karade Kh.
Taluka
Panvel
District
Raigarh
Pincode
410220
Survey no.
GUT NO 143, HISSA NO 3C
North boundary
ADJOINING ROAD
East boundary
SURVEY NO 145
South boundary
SURVEY NO 145
West boundary
SURVEY NO 144 GAOTHAN
What’s nearby
Schools1 school within 1km
HealthcareHospital 1.8km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 4.6 kmPrimary road 157 mRailway line 2.0 km · Konkan RailwayRailway station 2.4km away (Rasayani)Limited bus connectivity nearby
Water & environment
River 595 m · PatalgangaWater body 1.3 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹46,238per sq yd
₹55,300per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Karade Kh.”.
In force
2026-2027 schedule

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Office Of District Collector, Raigad

Collector office
Building Permit
Survey no. GUT NO 143, HISSA NO 3C

The promised possession date (30 Dec 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Office Of District Collector, Raigad

Planning authority

Has approved 6 RERA projects0% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
6
On record
227 flats · 0 plots
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

1,342 residential projects still under way within 25 km. Step out ring by ring:

Of the 86 projects the radar draws within 6 km — every kind, every stage — 37 are residential projects still under way. This list keeps only those, and looks further out.

3 projects within 1 km — showing the nearest 3.

150 m awayResidential / Group Housing

Tulsi Kalash City Phase III

TRILOK PROPERTIES PRIVATE LIMITED · Karade Kh. · Panvel

Feb 2024registered
Mar 2028target completion
Government Guidance Rate₹46,238/sq ydScale232 flatsAuthorityMahaRERA
250 m awayResidential / Group Housing

Vista Harmony Phase 2

Divine Group · Karade Kh. · Panvel

Jan 2026registered
Dec 2030target completion
Government Guidance Rate₹46,238/sq ydScale204 flatsAuthorityMahaRERA
890 m awayResidential / Group Housing

VINAYAK GREENS

TRINETRAM REALTY · Kasap · Panvel

Sep 2022registered
Dec 2027target completion
Government Guidance Rate₹53,094/sq ydScale134 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.