HORIZON
Share

GOLDEN VELLY

PR/GJ/SURAT/SURAT CITY/SUDA/PAA10541/060822 · GujRERA · https://gethorizon.in/projects/golden-velly-surat-city-4z8fclr7

01

Complete project overview

GujRERA · Registration filing
Plots
31 plots
Mix
31 × Residential Plots
Carpet area
62–106 sq mper-unit range, as filed
Land area
3,703 sq m

Timeline

Project startedMar 2022
RERA registeredAug 2022
Proposed completionJun 2024
TodaySep 2026
Construction progress

0% overall, as filed

Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.

Find your plot

Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.

31 plots across 1 batch
TypeArea sq mCount
Residential Plots7931

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

GujRERA · Builder registration

VITTHALBHAI MOHANBHAI SATASIYA

Individual/PropritorshipPromoter type
Surat, GujaratBased in
1Projects
1City
2022–2024Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

GujRERA · Registration filing
Taluka
Surat City
District
Surat
Address
BLOCK/SURVEY NO.385, MOUJE LAJPOR, TAL. CHORYASI, DIST. SURAT
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 814m away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 322 m · Dandi Heritage HighwayPrimary road 2.7 kmRailway line 2.1 km · Mumbai - Delhi RailwayRailway station 2.8km away (Sachin)Limited bus connectivity nearby
Water & environment
River 773 m · MindholaWater body 2.4 km · Ponsra water tankCanal 4.0 km
distances only — not a flood assessment
Land, title & encumbrance
MortgageLoan outstanding · ₹26.6 Lakh outstanding
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price

₹2.37 Cr declared to build 31 plots. What that works out to:

₹7.64 Lakh – ₹12.00 Lakhdeclared unit pricerange on the filing — not a live asking price
₹7.65 Lakhdeclared cost per plotall-in — land + construction
₹595/sq ftof plotted area₹6,403/sq m
73%of the cost is land₹432/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Gujarat registration department

In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.

No government guidance rate is shown for this project.

Gujarat's jantri is in Horizon's record, but this filing names no place the book prints — or names two — and a survey number repeats in every village of a district, so nothing can be tied to this project without guessing.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

GujRERA · Approved building plan

Surat Urban Development Authority

Urban Development Authority
Layout Permitapproved 6 Aug 2022 · 4 yrs ago

The promised possession date (30 Jun 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

Building-Use (BU) permission — the occupancy sign-off, on record

All 1 block carry a Building-Use (BU) permission (latest 31 Mar 2024)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.

The approving body, at scale

Surat Urban Development Authority

Urban Development Authority

Has approved 895 RERA projectsabout 1 in 19 in Gujarat.

a mixed market65% apartments · 35% plotted layouts.

Builders
734
On record
1,12,087 flats · 25,390 plots
Reach
14 talukas
Since
2008

More layout-heavy than Gujarat overall — 35% plots here vs 6% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by GujRERA

07

Other projects nearby

The register · within 25 km

407 plotted projects still under way within 25 km. Step out ring by ring:

Of the 66 projects the radar draws within 6 km — every kind, every stage — 27 are plotted projects still under way. This list keeps only those, and looks further out.

1 project within 1 km — showing the nearest 1.

800 m awayPlotted Development

AYODHYA INDUSTRIAL PARK

MITAL BHAVESHKUMAR KATHROTIA · Choryasi

Apr 2024registered
Dec 2027target completion
Price band₹13.44 Lakh–₹45.02 LakhScale17 plotsAuthorityGujRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.