HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

IRIS MIRA ROAD E

P51700021045 · MahaRERA · https://gethorizon.in/projects/iris-mira-road-e-mira-bhayandar-m-corp-thane-80jte7o7

01

Complete project overview

MahaRERA · Registration filing
Project name
IRIS MIRA ROAD E
Units
341 units
Mix
330 × 1 BHK · 11 × Shop
Carpet area
11–43 sq mper-unit range, as filed
Floors
19
Buildings
3
Parking
330 spaces
Land area
19,363 sq m
Sanctioned built-up
14,369 sq m
Recreational open space
2,645 sq m

Timeline

RERA registeredMay 2019
Proposed completionDec 2022
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

341 units across 10 batches
TypeArea sq mCount
1 BHK43330
Shop342
Shop261
Shop141
Shop261
Shop141
Shop112
Shop141
Shop151
Shop341

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

JEETENDRA ALIAS RAVI AMARNATH KAPOOR

IndividualPromoter type
Mumbai Suburban, MAHARASHTRABased in
3Projects
1City
2019–2025Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
836 homeson the public record across 3 projects
32,280 sq mbuilt-up filed
55,777 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from JEETENDRA ALIAS RAVI AMARNATH KAPOOR— the full portfolio →

03

Location

MahaRERA · Registration filing
≈ area only · geocoded, verified but not exact · 19.2966, 72.8877 · © OpenStreetMap contributors
Village
Mira-Bhayandar (M Corp.)
Taluka
Thane
District
Thane
Pincode
401107
Survey no.
21/1, 24/2
North boundary
SURVEY NO 20-5 AND 20-7
East boundary
SURVEY NO 21-2
South boundary
SURVEY NO 24-3
West boundary
SURVEY NO 27-4
What’s nearby
SchoolsNearest school 1.8km away
HealthcareHospital 1.3km away · Clinic within 2km
LifestyleNo parks within 2km · Gym or sports centre 1.4km away
ShoppingNo supermarket within 2km · Mall 580m away
Getting around
Expressway 1.2 km · Western Express HighwayPrimary road 2.1 km · Mira Bhayandar RoadRailway line 3.5 kmMetro station 2.2km away (Kashigaon)Limited bus connectivity nearby
Water & environment
Water body 271 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹60,034per sq yd
₹71,800per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 101 divisions of “Mira-Bhayandar (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹26,923₹1,55,185 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
06

Other projects nearby

The register · within 25 km

3,640 residential projects still under way within 25 km. Step out ring by ring:

7 projects within 1 km — showing the nearest 6.

Mira-BhayandarOthers

SALASAR EXOTICA II

NORTH SOUTH ESTATE BUILDERS

Jan 2023registered
Dec 2027target completion
Government Guidance Rate₹60,034/sq ydScale154 flatsAuthorityMahaRERA
GhodbunderMixed

CODENAME ENDGAME – TOWER 2

JP Infra Realty Private Limited

Jun 2026registered
Dec 2034target completion
Government Guidance Rate₹1,01,757/sq ydScale559 flatsAuthorityMahaRERA
GhodbunderMixed

CODENAME ENDGAME – TOWER 1

JP Infra Realty Private Limited

Jun 2026registered
Dec 2034target completion
Government Guidance Rate₹1,01,757/sq ydScale116 flatsAuthorityMahaRERA
GhodbunderResidential / Group Housing

RD Royalton

Ravi Developments

Aug 2026registered
Dec 2028target completion
Government Guidance Rate₹1,01,757/sq ydScale77 flatsAuthorityMahaRERA
Mira-BhayandarResidential / Group Housing

HILL GALAXY PHASE II

GULAMRASUL MOHAMMED ALI SHAIKH

Aug 2025registered
Jun 2030target completion
Government Guidance Rate₹60,034/sq ydScale41 flatsAuthorityMahaRERA
Mira-BhayandarResidential / Group Housing

WALCHAND AVENUE

PRAMANIK HOMES LLP

May 2024registered
Dec 2028target completion
Government Guidance Rate₹60,034/sq ydScale33 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the general area only, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • Maharashtra IGR — Annual Statement of Rates.
  5. 05Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  6. 06Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/iris-mira-road-e-mira-bhayandar-m-corp-thane-80jte7o7.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.