The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNearest school 1.4km away · College or university 801m away
HealthcareHospital 1.7km away · Clinic within 2km
LifestylePark 1.2km away
ShoppingNo supermarket within 2km · Bank 908m away
Getting around
Expressway 2.2 km · FlyoverPrimary road 2.2 kmRailway line 3.3 km · Mathura - AgraRailway station 3.4km away (Bilochpura)Limited bus connectivity nearby
Water & environment
River 293 m · Yamuna
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹27.00 Cr declared. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~40 m of the filed location.
Satellite photographs of the same ground
Apr 2017Apr 2023Mar 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~40 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate checked only against its district, not its pincode.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Uttar Pradesh registration department
In Uttar Pradesh it’s called the circle rate.
No government guidance rate is shown for this project.
Uttar Pradesh's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
UP-RERA · Approved building plan
Building Permit
The promised possession date (15 Oct 2018) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
07
Complaints & litigation
UP-RERA · public record
Complaints register
None on record with UP-RERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to UP-RERA
Litigation
None declared in this filing
Only what the builder declared, or what UP-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with UP-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
30 residential projects still under way within 25 km. Step out ring by ring:
Of the 51 projects the radar draws within 6 km — every kind, every stage — 6 are residential projects still under way. This list keeps only those, and looks further out.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Uttar Pradesh's published schedules.
06Planning authority
UP-RERA: the approved building plan, as filed.
07Complaints & litigation
UP-RERA's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/kalyani-heights-agra-2k2aoxek.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.