HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
384 units
Mix
311 × 1BHK · 64 × Others · 9 × Office space
Booked
314 of 384 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
28,177 sq m
Floor area
66,153 sq m
Description
LANDMARK VILLAGE TOWER VII

Timeline

Project startedAug 2018
RERA registeredAug 2021
Proposed completionJun 2028
TodayJul 2026
Construction progress

55% overall, as filed

Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Sanitary Fittings60%
Electrical Fittings60%
Staircases, Lifts Wells75%
Overhead and Underground Water Tanks.75%
The external plumbing and external plastering80%
Completion of terraces floor each building80%
Excavation100%
Basement(s) and Plinth100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

70 of 384 available
TypeArea sq mAvailable
1BHK461 of 2
Others270 of 15
1BHK412 of 15
Office space271 of 1
Others270 of 15
1BHK3419 of 60
1BHK4210 of 15
Office space270 of 1
Others251 of 15
Others251 of 15
1BHK461 of 1
Others270 of 1
Office space250 of 1
1BHK431 of 30
1BHK3310 of 60
Office space241 of 2
Office space231 of 1
Office space241 of 1
Others290 of 2
1BHK470 of 1
1BHK444 of 4
Office space241 of 1
1BHK439 of 60
1BHK362 of 2
1BHK451 of 1
Others270 of 1
Office space201 of 1
1BHK412 of 60

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

CALICUT LANDMARK BUILDERS AND DEVELOPERS INDIA PRIVATE LIMITED

CompanyPromoter type
Kozhikode, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
14Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
2,689 homeson the public record across 14 projects
3,26,468 sq mbuilt-up filed
1,60,999 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Kodenchery GramapanchayatLocal body (LSGI)this project4 of 14 projects
Kozhikode Municipal CorporationMunicipal Corporation3 of 14 projects
OlavannaLocal body (LSGI)3 of 14 projects
Kodencherry GramapanchayathLocal body (LSGI)2 of 14 projects
Olavanna Grama PanchayatGrama Panchayat2 of 14 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
KAITHAPOYIL-KODANCHERY ROAD
Village
KODANCHERY
Taluk
THAMARASSERY
District
Kozhikode
Pincode
673580
Survey no.
15/1
Patta no.
4223, 4224
What’s nearby
SchoolsNearest school 2.0km away · Library 1.3km away
HealthcareNearest hospital 2.5km away
LifestyleNo parks within 2km
ShoppingSupermarket 1.3km away
Getting around
Expressway 4.2 km · Kozhikode Wayanad RoadPrimary road 938 m · Kappad - Thusharagiri - Adivaram roadNo metro or railway within 5km2 bus stops within 500m
Water & environment
River 1.5 km · CherupuzhaWater body 2.0 km · Malabar Crusher Stone Works Parakkulam
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Kodenchery Gramapanchayat

Local body (LSGI)
approved 1 Feb 2017 · 9 yrs ago
Building Permit no. A1/44/13-14Survey no. 15/1
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan A1/44/13-14 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

The local self-government (LSGI)

The local body that sanctioned this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.