HORIZONMarkets
01

Complete project overview

K-RERA · Registration filing
Units
166 units
Mix
76 × 2BHK · 60 × 3BHK · 24 × 1BHK · 4 × 4BHK · 2 × 5 BHK and More
Booked
121 of 166 filed sold/bookedas declared in the RERA filing
Buildings
2
Land area
16,116 sq m
Floor area
19,212 sq m
Description
LANDMARK WORLD ENTASIS, LANDMARK WORLD FRIEZE

Timeline

Project startedMar 2014
RERA registeredJul 2021
Proposed completionDec 2021
TodayJul 2026
Construction progress

86% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Excavation100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

45 of 166 available
TypeArea sq mAvailable
3BHK1021 of 43
1BHK390 of 3
1BHK350 of 3
1BHK390 of 3
5 BHK and More1970 of 1
5 BHK and More2000 of 1
1BHK350 of 3
1BHK330 of 3
1BHK660 of 6
1BHK330 of 3
2BHK7820 of 21
2BHK780 of 22
2BHK610 of 1
4BHK2170 of 1
4BHK3150 of 1
3BHK1375 of 17
2BHK1147 of 15
2BHK11812 of 17
4BHK2100 of 2

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

CALICUT LANDMARK BUILDERS AND DEVELOPERS INDIA PRIVATE LIMITED

CompanyPromoter type
Kozhikode, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
14Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
2,689 homeson the public record across 14 projects
3,26,468 sq mbuilt-up filed
1,60,999 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Kodenchery GramapanchayatLocal body (LSGI)4 of 14 projects
Kozhikode Municipal CorporationMunicipal Corporation3 of 14 projects
OlavannaLocal body (LSGI)3 of 14 projects
Kodencherry GramapanchayathLocal body (LSGI)2 of 14 projects
Olavanna Grama PanchayatGrama Panchayatthis project2 of 14 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
LANDMARK WORLD
Village
OLAVANNA
Taluk
Kozhikode
District
Kozhikode
Pincode
673014
Survey no.
39/11, 39/14, 39/9, 39/12, 39/13, 48/13
Patta no.
425
What’s nearby
Schools1 school within 500m · 3 educational institutions within 1km · College or university 1.5km away
HealthcareHospital 429m away · Clinic within 2km
LifestylePark 980m away · 4 restaurants and cafes within 1km
ShoppingSupermarket 1.7km away · Mall 899m away
Getting around
Expressway 166 m · Kannur-Calicut-Valanchery HighwayPrimary road 3.5 km · Mini Byepass RoadNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 789 m · Aanchiyil KulamRiver 821 m · Mampuzha River
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Olavanna Grama Panchayat

Grama Panchayat
approved 16 Feb 2010 · 16 yrs ago
Building Permit no. BL-622/09-10Survey no. 39/11, 39/14, 39/9, 39/12, 39/13, 48/13

The promised possession date (30 Dec 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan BL-622/09-10 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Olavanna Grama Panchayat

Grama panchayat

Has approved 16 RERA projects1% of Kerala.

an apartments market94% apartments · 6% plotted layouts. Apartments like yours are this body's core business.

Builders
10
On record
2,233 flats · 23 plots
Since
2021

More apartment-heavy than Kerala overall — 94% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.