HORIZON
Share

Laxmi Heights

P51800019941 · MahaRERA · https://gethorizon.in/projects/laxmi-heights-kurla-9k4ozw1t

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
29 units
Floors
13
Buildings
2
Land area
786 sq m

Timeline

RERA registeredMar 2019
Proposed completionDec 2024
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

Pankajkumar & Co.

PartnershipPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2019–2024Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Kurla
Taluka
Kurla
District
Mumbai Suburban
Pincode
400083
Survey no.
68 ,68 1 to 9 of Village Hariyali
North boundary
CTS No 77 and 69 Part to the North
East boundary
CTS No 67 to the East
South boundary
Vikhroli Station Road to the South
West boundary
CTS No 69 to the West
What’s nearby
SchoolsNearest school 1.2km away · Library 1.8km away
HealthcareHospital 156m away · 3 clinics within 1km · Doctor's clinic within 1km
LifestylePark 1.7km away
ShoppingSupermarket 1.1km away · Mall 1.1km away · Bank 176m away
Getting around
Expressway 614 mPrimary road 134 m · Lal Bahadur Shastri MargRailway line 140 m · Central Railways Fast LineRailway station 124m away (Vikhroli)13 bus stops within 500m
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Slum Rehabilitation Authority

Slum Rehabilitation Authority
Building Permit
Survey no. 68 ,68 1 to 9 of Village Hariyali

The promised possession date (30 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Slum Rehabilitation Authority

Planning authority

Has approved 729 RERA projects3.6% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

4,938 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,169 projects the radar draws within 6 km — every kind, every stage — 391 are residential projects still under way. This list keeps only those, and looks further out.

24 projects within 1 km — showing the nearest 6.

KurlaResidential / Group Housing

METRO CROWN

METRO ENTERPRISES

Sep 2022registered
Dec 2027target completion
Scale73 flatsAuthorityMahaRERA
KurlaResidential / Group Housing

Lodha Vikhroli - Tower C1

Lodha Developers Limited

Jun 2022registered
Dec 2027target completion
Scale226 flatsAuthorityMahaRERA
VIKHROLI WESTOthers

MEADOWS 83

SHREEJI REALTORS

Jan 2023registered
Oct 2026target completion
Scale72 flatsAuthorityMahaRERA
KurlaOthers

AIKYA ROOTS

RACEK INDUSTRIES PVT LTD

Oct 2022registered
Jun 2027target completion
2 open complaintsScale169 flatsAuthorityMahaRERA
KurlaResidential / Group Housing

Puneet Brahmand

PUNEET EDIFICE PVT LTD

Sep 2022registered
Dec 2026target completion
Scale125 flatsAuthorityMahaRERA
KurlaOthers

Shubh Elanza

Shubh Vastu Lifespace LLP

Nov 2022registered
Aug 2026target completion
Scale172 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.