Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
112 units across 25 batches
TypeArea sq mCount
Flat 6424
Shop138
Flat 9588
Shop1414
Flat 8491
Flat 1248
Flat 7493
Flat 2258
Flat 33912
Flat 4408
Flat 5414
Shop91
Flat 8424
Flat 1254
Flat 5393
Flat 2254
Flat 6404
Flat 3393
Flat 7413
Flat 4393
Flat 9441
Flat 10491
Flat 11501
Flat 12511
Shop161
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareNearest hospital 3.6km away · 1 clinic within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 174 mPrimary road 1.7 kmRailway line 3.8 kmRailway station 3.8km away (Dolavli)Limited bus connectivity nearby
Water & environment
Water body 395 mRiver 459 m · Patalganga
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹27,927per sq yd
₹33,400per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Khopoli”.
In force
2026-2027 schedule
Spread
₹22,325 – ₹40,636 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
457 residential projects still under way within 25 km. Step out ring by ring:
Of the 115 projects the radar draws within 6 km — every kind, every stage — 18 are residential projects still under way. This list keeps only those, and looks further out.