MOOPANS RIVERSIDE

T1/OL/409/2021 · K-RERA · https://gethorizon.in/projects/moopans-riverside-keezhmad-ernakulam-ycj4o9f4

01

Complete project overview

K-RERA · Registration filing
Project name
MOOPANS RIVERSIDE
Units
38 units
Mix
20 × 3BHK · 18 × 2BHK
Booked
5 of 38 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
2,176 sq m
Floor area
6,274 sq m
Description
MOOPANS RIVERSIDE

Timeline

Project startedAug 2017
RERA registeredNov 2021
Proposed completionJan 2023
TodaySep 2026
Construction progress

86% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Installation of lifts, water pumps etc90%
Fire Fighting Fittings and Equipment90%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc90%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Per-activity completion % from the builder's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

33 of 38 available
TypeArea sq mAvailable
2BHK9117 of 18
3BHK1072 of 2
3BHK11614 of 18

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.

02

Builder’s track record

K-RERA · Builder registration

Moopans

PartnershipPromoter type
Ernakulam, KeralaBased in
No — the promoter declared this is a first projectDeclared prior experience
1Projects
1Cities
2021–2023Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
chalakkal
Village
KEEZHMAD
Taluk
Aluva
District
Ernakulam
Pincode
683105
Survey no.
204/3
Patta no.
thandaper account no.11561
What’s nearby
SchoolsNo schools within 2km · Library 945m away
HealthcareHospital 246m away
LifestyleNo parks within 2km · Playground within 500m · Gym or sports centre 1.7km away
ShoppingNo supermarket within 2km · Convenience store within 1km
Getting around
Expressway 4.2 km · Salem - Kochi - Kanyakumari HighwayPrimary road 1.7 km · Aluva - Munnar RoadRailway line 3.2 kmRailway station 3.5km away (Aluva)6 bus stops within 500m
Water & environment
Canal 99 mWater body 462 m · Ambala Chira
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Government Guidance Rate

Kerala registration department

In Kerala it’s called the fair value.

No government guidance rate is shown for this project.

Kerala's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

K-RERA · Approved building plan

Keezhmad Gramapanchayath

Local body (LSGI)
approved 8 Feb 2017 · 9 yrs ago
Building Permit no. 27/2017Survey no. 204/3

The promised possession date (30 Jan 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan 27/2017 on the approving authority’s portal to confirm the approval.

The approving body, at scale

The local self-government (LSGI)

The local body that approved this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

189 residential projects still under way within 25 km. Step out ring by ring:

3 projects between 3 and 6 km — showing the nearest 3.

ALUVA WESTResidential (Apartment)

RCN REGAL PALACE

RCN IDEAL Homes Pvt Ltd

Jul 2026registered
Mar 2031target completion
Government Guidance Rate₹6,622/sq ydScale40 flatsAuthorityK-RERA
CHOORNIKKARAResidential (Apartment)

DD GLOBAL KINGDOM

DESAI HOMES

Mar 2024registered
Aug 2028target completion
Scale128 flatsAuthorityK-RERA
NEDUMBASSERYMixed (Commercial & Residential)

MJ Residency

MJ Builders

May 2024registered
Jul 2026target completion
Government Guidance Rate₹1,324/sq ydScale21 flatsAuthorityK-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.