Nallur Shantharam Retreat

PRM/KA/RERA/1258/404/PR/271123/006443 · RERA Karnataka · https://gethorizon.in/projects/nallur-shantharam-retreat-davanagere-hf6xwvlf

01

Complete project overview

RERA Karnataka · Registration filing
Units
30 units
Unit mix
15 × 2 BHK · 15 × 3 BHK
Towers
1
Floors
4
Land area
947 sq m
Built-up area
2,049 sq m
FAR sanctioned
1.48
Covered area
341 sq m
Open area
606 sq m
Land parcels
1 survey no

Timeline

Project startedSep 2023
RERA registeredNov 2023
Proposed completionDec 2026
TodaySep 2026
Construction progress

100% overall, as filed

Sub-structure100%
Super-structure100%
Finishing100%
Internal infra100%
External infra100%
Amenities100%
Common areas100%
From the builder's latest quarterly progress report filed with RERA Karnataka — % complete overall and by stage, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Every flat the builder registered, with the carpet area they filed. Look yours up and check it against what you were shown.

UnitTypeCarpet sq mExclusive area sq mUndivided share sq m
101Ground Floor3 BHK122.5234.3035.02
102Ground Floor2 BHK106.5529.8330.45
103Ground Floor3 BHK123.6834.6335.35
104Ground Floor2 BHK99.6527.9028.48
105Ground Floor2 BHK93.2026.1026.64
106Ground Floor3 BHK117.1532.8033.48
2011st Floor3 BHK122.5234.3035.02
2021st Floor2 BHK106.5529.8330.45
2031st Floor3 BHK123.6834.6335.35
2041st Floor2 BHK99.6527.9028.48
2051st Floor2 BHK93.2026.1026.64
2061st Floor3 BHK117.1532.8033.48
3012nd Floor3 BHK122.5234.3035.02
3022nd Floor2 BHK106.5529.8330.45
3032nd Floor3 BHK123.6834.6335.35
3042nd Floor2 BHK99.6527.9028.48
3052nd Floor2 BHK93.2026.1026.64
3062nd Floor3 BHK117.1532.8033.48
4013rd Floor3 BHK122.5234.3035.02
4023rd Floor2 BHK106.5529.8330.45
4033rd Floor3 BHK123.6834.6335.35
4043rd Floor2 BHK99.6527.9028.48
4053rd Floor2 BHK93.2026.1026.64
4063rd Floor3 BHK117.1532.8033.48
5014th Floor3 BHK122.5234.3035.02
5024th Floor2 BHK106.5529.8330.45
5034th Floor3 BHK123.6834.6335.35
5044th Floor2 BHK99.6527.9028.48
5054th Floor2 BHK93.2026.1026.64
5064th Floor3 BHK117.1532.8033.48

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. Carpet area is the legally meaningful number — not the super built-up figure a brochure quotes. Exclusive area is the common area allotted exclusively to the unit's owner, as the register names it. Undivided share is the portion of the land that comes with the unit, as filed — a share of the whole plot, not a demarcated piece of ground.

All 30 units as filed, two to a row · areas in sq m
UnitTypeCarpetExclusive areaUndivided shareUnitTypeCarpetExclusive areaUndivided share
101Ground Floor3 BHK122.5234.3035.02102Ground Floor2 BHK106.5529.8330.45
103Ground Floor3 BHK123.6834.6335.35104Ground Floor2 BHK99.6527.9028.48
105Ground Floor2 BHK93.2026.1026.64106Ground Floor3 BHK117.1532.8033.48
2011st Floor3 BHK122.5234.3035.022021st Floor2 BHK106.5529.8330.45
2031st Floor3 BHK123.6834.6335.352041st Floor2 BHK99.6527.9028.48
2051st Floor2 BHK93.2026.1026.642061st Floor3 BHK117.1532.8033.48
3012nd Floor3 BHK122.5234.3035.023022nd Floor2 BHK106.5529.8330.45
3032nd Floor3 BHK123.6834.6335.353042nd Floor2 BHK99.6527.9028.48
3052nd Floor2 BHK93.2026.1026.643062nd Floor3 BHK117.1532.8033.48
4013rd Floor3 BHK122.5234.3035.024023rd Floor2 BHK106.5529.8330.45
4033rd Floor3 BHK123.6834.6335.354043rd Floor2 BHK99.6527.9028.48
4053rd Floor2 BHK93.2026.1026.644063rd Floor3 BHK117.1532.8033.48
5014th Floor3 BHK122.5234.3035.025024th Floor2 BHK106.5529.8330.45
5034th Floor3 BHK123.6834.6335.355044th Floor2 BHK99.6527.9028.48
5054th Floor2 BHK93.2026.1026.645064th Floor3 BHK117.1532.8033.48
02

Builder’s track record

RERA Karnataka · Builder registration

Nainika Infrastructure Pvt Ltd

CompanyPromoter type
DavangereBased in
1Projects
1City
2023–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Karnataka · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 3 new projects last year
  • 21 nearby projects
1 km radius · coordinates as filed · 14.4582, 75.9105 · © OpenStreetMap contributors
Taluk
Davanagere
District
Davangere
Pincode
577004
Address
SITE No. 407, DOOR No. 2278, PID NO.28-2-55-34/A-0-2 , MCC 'A' BLOCK , Davanagere , Davangere, Karnataka - 577004
North boundary
406
East boundary
7th Main Road
South boundary
408
West boundary
585 & 586
What’s nearby
Schools1 school within 500m · 3 educational institutions within 1km · College or university 509m away
HealthcareHospital 190m away · 27 clinics within 1km · Pharmacy within 1km
Lifestyle1 park within 500m · Gym or sports centre 979m away · 15+ restaurants and cafes within 1km
ShoppingSupermarket 695m away · Mall 635m away · Convenience store within 1km
Getting around
Expressway 2.2 km · Harihara Davangere BypassPrimary road 1.0 km · Hadadi RoadRailway line 1.3 kmRailway station 1.5km away (Davanagere)3 bus stops within 500m
Water & environment
Water body 2.2 km · Kundavada Lake
distances only — not a flood assessment
Land, title & encumbrance
LandJoint development (JDA) — built on the owner’s land by agreement
ConversionOne or more surveys not converted to non-agricultural
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price

₹5.77 Cr declared to build 30 flats. What that works out to:

₹19.22 Lakhdeclared cost per flatall-in — land + construction
₹2,614/sq ftof built-up area₹28,142/sq m
33%of the cost is land₹1,859/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

A building already stood within ~20 m of the recorded location in 2016 — before this project started in 2023. The yearly view ends in 2023, so it does not cover this project's own construction; see the 2026 image.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.

Satellite photographs of the same ground

Apr 2017
Mar 2023
Apr 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • A building is first visible in 2016.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • Site is a ~20 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
  • The yearly site view ends in 2023, before this project started in 2023.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Karnataka registration department

In Karnataka it’s called the guidance value.

No government guidance rate is shown for this project.

Karnataka's guidance-value gazettes are in Horizon's record, but this project's address doesn't name a place any of its sub-registrar's tables print.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Planning authority

RERA Karnataka · Approved building plan

Davanagere-Harihara Urban Development Authority

Urban Development Authority
approved 23 May 2023 · 3 yrs ago
Building Permit no. DVG-LBPAS-18691/22-23/BPSurvey no. 407
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

Verify it yourself — look up plan DVG-LBPAS-18691/22-23/BP on the approving authority’s portal to confirm the approval.

The approving body, at scale

Davanagere-Harihara Urban Development Authority

Urban Development Authority

Has approved 24 RERA projects0.3% of Karnataka.

a mixed market50% apartments · 50% plotted layouts.

Builders
24
On record
268 flats · 857 plots
Reach
6 taluks
Since
2018

More layout-heavy than Karnataka overall — 50% plots here vs 38% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RERA Karnataka

08

Other projects nearby

The register · within 25 km

13 residential projects still under way within 25 km. Step out ring by ring:

Of the 21 projects the radar draws within 6 km — every kind, every stage — 12 are residential projects still under way. This list keeps only those, and looks further out.

3 projects within 1 km — showing the nearest 3.

180 m awayApartment

CASA LUXURIA

A M BUILDERS · Davanagere

Oct 2023started
Dec 2026target completion
Declared cost₹7.51 CrScale32 flatsAuthorityRERA Karnataka
340 m awayApartment

PARK TERRACES

SHUBAM CONSTRUCTION · Davanagere

May 2025started
Dec 2029target completion
Declared cost₹8.25 CrScale12 flatsAuthorityRERA Karnataka
400 m awayApartment

SHRADDHA

SHUBAM CONSTRUCTION · Davanagere

Jul 2025started
Dec 2029target completion
Declared cost₹4.25 CrScale8 flatsAuthorityRERA Karnataka

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with RERA Karnataka, as the builder submitted it.
  2. 02Builder's track record
    • RERA Karnataka: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location & price analysis
    • Address, pincode and declared cost: the RERA Karnataka filing.
    • Coordinates: as filed with RERA Karnataka.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • No government guidance rate could be matched to this project from Karnataka's published schedules.
  6. 06Planning authority
    • RERA Karnataka: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  7. 07Complaints & litigation
    • RERA Karnataka's public record lists no complaints or litigation for this project.
  8. 08Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/nallur-shantharam-retreat-davanagere-hf6xwvlf.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.