Complete project overview

K-RERA · Registration filing
Units
148 units
Mix
148 × 3BHK
Booked
145 of 148 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
7,667 sq m
Floor area
16,154 sq m
Description
NANMA EASTFORT

Timeline

Project startedFeb 2021
RERA registeredApr 2021
Proposed completionDec 2025
TodayJul 2026
Construction progress

88% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

3 of 148 available
TypeArea sq mAvailable
3BHK653 of 148

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

NANMA PROPERTIES LTD

CompanyPromoter type
Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
5Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
1,255 homeson the public record across 5 projects
1,21,851 sq mbuilt-up filed
33,295 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Kochi Muncipal Municipal CorporationMunicipal Corporation2 of 5 projects
Kozhikode Municipal CorporationMunicipal Corporation1 of 5 projects
Marady Grama PanchayatGrama Panchayatthis project1 of 5 projects
Tripunithura MuncipalityLocal body (LSGI)1 of 5 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Muvattupuzha
Village
MARADY
Taluk
Muvattupuzha
District
Ernakulam
Pincode
686673
Survey no.
417/4B-7-2,417/4B-8,417/4C-2-2,417/2-4-4,4A-10-2
Patta no.
25032
What’s nearby
SchoolsNo schools within 2km · Library 837m away
HealthcareNearest hospital 3.4km away · 1 clinic within 1km
LifestylePark 1.5km away
ShoppingNo supermarket within 2km · Bank 922m away
Getting around
Expressway 3.6 km · Kochi - Madurai - Dhanushkodi RoadPrimary road 1.2 km · MC RoadNo metro or railway within 5kmBus stop within 1km
Water & environment
Canal 552 mWater body 577 mRiver 1.0 km · Muvattupuzha River
distances only — not a flood assessment
04

Planning authority

K-RERA · Approved building plan

Marady Grama Panchayat

Grama Panchayat
approved 14 Sep 2022 · 3 yrs ago
Building Permit no. C2-BA(293574)/2022Survey no. 417/4B-7-2,417/4B-8,417/4C-2-2,417/2-4-4,4A-10-2

The promised possession date (10 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan C2-BA(293574)/2022 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Grama Panchayat

A village-level local self-government (LSGI) that issues the permit — Kerala's most common approving body. It has approved 268 RERA projects across 13 districts about 1 in 6 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.