HORIZON
Share

NEHA GALAXY

P51500007450 · MahaRERA · https://gethorizon.in/projects/neha-galaxy-devlai-aurangabad-el8pr1vd

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
NEHA GALAXY
Units
99 units
Mix
86 × 2 BHK · 13 × Shop
Carpet area
12–56 sq mper-unit range, as filed
Floors
6
Buildings
4
Parking
76 spaces
Land area
5,110 sq m
Sanctioned built-up
5,110 sq m
Recreational open space
768 sq m

Timeline

RERA registeredAug 2017
Proposed completionAug 2022
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

99 units across 19 batches
TypeArea sq mCount
2 BHK536
Shop142
2 BHK5410
Shop142
Shop132
Shop122
Shop222
Shop201
Shop222
2 BHK564
2 BHK5212
2 BHK5212
2 BHK366
2 BHK366
2 BHK3612
2 BHK3612
2 BHK493
2 BHK512
2 BHK501

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

NEHA CONSTRUCTION

CompanyPromoter type
Aurangabad, MAHARASHTRABased in
2Projects
2Cities
2017–2024Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
131 homeson the public record across 2 projects
6,334 sq mbuilt-up filed
6,320 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from NEHA CONSTRUCTION— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Devlai
Taluka
Aurangabad
District
Aurangabad
Pincode
431002
Survey no.
GUT NO 91
North boundary
PART OF LAND GUT NO 91
East boundary
GUT NO 90
South boundary
PART OF LAND GUT NO 91
West boundary
ROAD
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 2.3km away
LifestylePark 908m away
ShoppingNo supermarket within 2km
Getting around
Expressway 2.5 km · Katraj - Dehu Road BypassPrimary road 2.5 kmRailway line 3.6 kmRailway station 3.7km away (Dehu Road)Limited bus connectivity nearby
Water & environment
Water body 515 mRiver 719 m · Pavana
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹27,174per sq yd
₹32,500per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Devlai”.
In force
2026-2027 schedule
Spread
₹25,753₹36,422 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
06

Other projects nearby

The register · within 25 km

2,305 residential projects still under way within 25 km. Step out ring by ring:

Of the 739 projects the radar draws within 6 km — every kind, every stage — 243 are residential projects still under way. This list keeps only those, and looks further out.

7 projects within 1 km — showing the nearest 6.

350 m awayOthers

SHALIGRAM PAVILLIA

SHALIGRAM REALTY LLP · Gahunje · Mawal

Apr 2022registered
Dec 2027target completion
2 open complaintsScale224 flatsAuthorityMahaRERA
390 m awayResidential / Group Housing

101

ARR Lifespace LLP · Gahunje · Mawal

Aug 2026registered
Dec 2031target completion
Scale46 flatsAuthorityMahaRERA
500 m awayResidential / Group Housing

Lodha Belmondo - Tower 32

Lodha Developers Limited · Gahunje · Mawal

Mar 2019registered
Jun 2026target completion
Scale85 flatsAuthorityMahaRERA
730 m awayResidential / Group Housing

Lodha Belmondo St. Andrews A

Macrotech Developers Limited · Gahunje · Mawal

Mar 2019registered
Feb 2027target completion
AuthorityMahaRERA
760 m awayResidential / Group Housing

Belmondo Townhouse 4

Lodha Developers Limited · Gahunje · Mawal

Aug 2026registered
Aug 2030target completion
Scale7 flatsAuthorityMahaRERA
950 m awayResidential / Group Housing

Ashok Villas Imperial

Peninsula Land Limited · Gahunje · Mawal

Jun 2026registered
Dec 2029target completion
Scale8 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.