Project name
Nirmay Heights
Units
14 units
Floors
6
Buildings
2
Land area
346 sq m
Sanctioned built-up
711 sq m

Timeline

RERA registeredMar 2022
Proposed completionDec 2025
TodaySep 2026
Construction progress
Podiums0%
Storm Water Drains0%
Water conservation…0%
Electrical meter r…0%
Water Supply30%
Sewerage (Chamber,…30%
Landscaping & Tree…50%
OC-readiness90%
Flat fit-out95%
Stairs & lifts95%
External finishes95%
Excavation100%
Basement (if any)100%
Plinth100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

Nirmay Infra

PartnershipPromoter type
Nashik, MAHARASHTRABased in
1Projects
1City
2022–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 97 new projects last year
  • 1,604 nearby projects
1 km radius · coordinates as filed · 19.9825, 73.8187 · © OpenStreetMap contributors
Village
Nashik (M Corp.)
Taluka
Nashik
District
Nashik
Pincode
422006
Survey no.
13/A/1 Plot No. 10
North boundary
ADJ CTS No 1768 1
East boundary
9 Mtr Open Road
South boundary
ADJ CTS No 1768 3
West boundary
ADJ CTS No 1763
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 671m away · 1 clinic within 1km
LifestylePark 1.4km away
ShoppingNo supermarket within 2km
Getting around
Expressway 1.1 km · Nashik Pune HighwayPrimary road 298 m · Ramdas Swami MargRailway line 3.4 kmRailway station 4.5km away (Nashik Road)Limited bus connectivity nearby
Water & environment
River 547 m · Nasardi
distances only — not a flood assessment
04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

A building already stood within ~20 m of the recorded location in 2016 (about 8 m), 9 m in 2023.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.

Satellite photographs of the same ground

Feb 2017
Feb 2023
Jan 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • A building is first visible in 2016.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • Site is a ~20 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹26,672per sq yd
₹31,900per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 40 divisions of “Nashik (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹22,074₹70,912 per sq yd across the places it was taken over

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
06

Planning authority

MahaRERA · Approved building plan

Bai Nashik Centre

Building Permit
Survey no. 13/A/1 Plot No. 10

The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

The planning authority

The body that approved this project. It has approved 4,607 RERA projects across 33 districts about 1 in 4 in Maharashtra.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

08

Other projects nearby

The register · within 25 km

1,076 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,604 projects the radar draws within 6 km — every kind, every stage — 549 are residential projects still under way. This list keeps only those, and looks further out.

15 projects within 1 km — showing the nearest 6.

230 m awayOthers

Bhavik Mithila

Bhavik Developers Private Limited · Nashik

Jun 2025registered
Dec 2032target completion
Government Guidance Rate₹26,213/sq ydScale235 flatsAuthorityMahaRERA
240 m awayResidential / Group Housing

SHYAM AVENUE

OM DEVELOPERS · Nashik

Mar 2025registered
Dec 2030target completion
Government Guidance Rate₹26,672/sq ydScale39 flatsAuthorityMahaRERA
430 m awayMixed

Anandsagar Annex Phase 1 ( L and M Wing )

Ravi Mahajan Builders & Developers Pvt. Ltd · Nashik

Aug 2025registered
Dec 2028target completion
Government Guidance Rate₹26,213/sq ydScale167 flatsAuthorityMahaRERA
460 m awayMixed

SRI KUBERLAXMI PARK

SRI KUBERLAXMI GROUP · Nashik

Jan 2026registered
Nov 2030target completion
Government Guidance Rate₹26,672/sq ydScale79 flatsAuthorityMahaRERA
460 m awayOthers

PARADIES PALMS

SAHYADRI CONSTRUCTION · Nashik

Dec 2020registered
Jun 2026target completion
Government Guidance Rate₹26,213/sq ydScale55 flatsAuthorityMahaRERA
460 m awayResidential / Group Housing

Ayodhya Palace

Shubh Sankalp Builders & Developers · Agartakali · Nashik

Mar 2022registered
Jan 2027target completion
Scale9 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • Maharashtra IGR — Annual Statement of Rates.
  6. 06Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  7. 07Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  8. 08Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/nirmay-heights-nashik-m-corp-ibmbthz7.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.