This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Units
18 units
Mix
18 × 3 BHK
Carpet area
104–106 sq mper-unit range, as filed
Floors
8
Buildings
2
Parking
2 spaces
Land area
1,078 sq m
Sanctioned built-up
1,137 sq m
Timeline
RERA registeredAug 2017
Proposed completionDec 2018
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
18 units across 3 batches
TypeArea sq mCount
3 BHK1066
3 BHK1046
3 BHK1066
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Nagpur (M Corp.)
Taluka
Nagpur (Urban)
District
Nagpur
Pincode
440004
Survey no.
PLOT NO 21 CITY SUREVEY NO 68/1 HOUSE NO 892/A
North boundary
ANANDA APARTMENT
East boundary
MADHAVA APARTMENT
South boundary
LAND OF SHRI MANOHAR APARTMENT AND JAGMOHAN SURI
West boundary
ROAD
What’s nearby
SchoolsNearest school 1.6km away · College or university 1.8km away
HealthcareHospital 166m away · 7 clinics within 1km
LifestylePark 1.0km away · Gym or sports centre 566m away
ShoppingSupermarket 1.1km away · Mall 612m away
Getting around
Expressway 1.0 km · Sadar FlyoverPrimary road 590 m · LIC- Automotive Double Decker FlyoverRailway line 556 mMetro station 575m away (Kadvi Square)Limited bus connectivity nearby
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹33,571per sq yd
₹40,150per sq m
Which rate
residential flat (built)
Matched to
The middle rate across the 84 divisions of “Nagpur (M Corp.)” — the city's middle, not this project's own division.
In force
2026-2027 schedule
Spread
₹17,709 – ₹86,288 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of city, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
436 residential projects still under way within 25 km. Step out ring by ring:
Of the 557 projects the radar draws within 6 km — every kind, every stage — 156 are residential projects still under way. This list keeps only those, and looks further out.
3 projects within 1 km — showing the nearest 3.
770 m awayResidential / Group Housing
KUKREJA EMBASSY-II
KUKREJA INFRASTRUCTURES · Nagpur
4 yr 5 mo
Jun 2024registered
Nov 2028target completion
Government Guidance Rate₹33,571/sq ydScale36 flatsAuthorityMahaRERA