These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
CST NO 331,331/1 TO 2, 332, 332/1 TO 42, 333 (PT), 354 (PT), 354/17, 358 AND 359,359/1 TO 8, 360 (PT) 364, 364/1 TO 12, 365, 365/1 TO 6, 366, 366/1 TO 15, 367, 368/1 TO 10, 369, 369/1 TO 18 AND 2095, 2095/1 TO 10
North boundary
13 point 44 Meter Wide Drive Way
East boundary
13 point 44 Meter wide DP Road
South boundary
C T S No 370
West boundary
13 point 40 Meter Wide DP Road
What’s nearby
Schools1 school within 1km · Library 1.1km away
HealthcareHospital 738m away · Clinic within 2km · Pharmacy within 1km
LifestylePark 1.4km away · Gym or sports centre 886m away · 14+ restaurants and cafes within 1km
ShoppingSupermarket 1.2km away · Convenience store within 1km · Bank 941m away
Getting around
Expressway 1.7 kmPrimary road 332 mRailway line 1.3 km · Western Railway (Fast)Metro station 405m away (CSMI Airport Domestic T1)6 bus stops within 500m
Water & environment
Water body 1.7 km · Vakola Nala
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Slum Rehabilitation Authority
Slum Rehabilitation Authority
Building Permit
Survey no. CST NO 331,331/1 TO 2, 332, 332/1 TO 42, 333 (PT), 354 (PT), 354/17, 358 AND 359,359/1 TO 8, 360 (PT) 364, 364/1 TO 12, 365, 365/1 TO 6, 366, 366/1 TO 15, 367, 368/1 TO 10, 369, 369/1 TO 18 AND 2095, 2095/1 TO 10
The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Slum Rehabilitation Authority
Planning authority
Has approved 729 RERA projects — 3.6% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
Court cases, as declared
Declared by the builder
2 cases
Number
Forum
Date
Civil Suit No 584 Of 2018
High Court Bombay
2018
Civil Suit No 2111 Of 2014
Mumbai City Civil Court at Dindoshi Branch
2014
What the builder declared
Declared to MahaRERA
Encumbrance
Declared financial encumbrance on the projectworth checking
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
3,891 residential projects still under way within 25 km. Step out ring by ring:
Of the 2,649 projects the radar draws within 6 km — every kind, every stage — 921 are residential projects still under way. This list keeps only those, and looks further out.