1 × Flat 601 Sale · 1 × 101 Hall Sale · 1 × 201 Hall Landowner · 1 × 301 Hall Landowner · 1 × 401 Hall Landowner · 1 × 501 Hall Landowner · 1 × Flat 602 Sale · 1 × 701 Hall Sale
Carpet area
20–137 sq mper-unit range, as filed
Floors
7
Parking
5 spaces
Land area
507 sq m
Sanctioned built-up
556 sq m
Timeline
RERA registeredMay 2024
Proposed completionMar 2027
TodaySep 2026
Construction progress
Podiums0%
Stilt floor0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Treatment And Disp…0%
Fire protection an…0%
Superstructure12%
Excavation100%
Basement (if any)100%
Plinth100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
8 units across 8 batches
TypeArea sq mCount
Flat 601 Sale1371
101 Hall Sale201
201 Hall Landowner201
301 Hall Landowner201
401 Hall Landowner201
501 Hall Landowner201
Flat 602 Sale1301
701 Hall Sale201
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Final Plot No 72A/15, CTS No 49/15, T P Scheme No 1, Erandwane, Taluka Haveli, Pune 411004
North boundary
Manas Society Bhakti Marg F P No 73 3 1
East boundary
Kunal Lexus F P No 72 A 16
South boundary
Gulmohor path road
West boundary
Geetai Bunglow F P No 72 A 14
What’s nearby
Schools2 schools within 500m · 16 educational institutions within 1km · College or university 926m away
HealthcareHospital 222m away · 20 clinics within 1km · Pharmacy within 500m
LifestylePark 1.3km away · Gym or sports centre 549m away · 50+ restaurants and cafes within 1km
ShoppingSupermarket 89m away · Mall 937m away · Convenience store within 1km
Getting around
Expressway 2.6 km · Bajirao RoadPrimary road 120 m · Vishwanath Dinkar Narawane PathRailway line 3.3 km · Mumbai–Pune RailwayMetro station 486m away (SNDT College)6 bus stops within 500m
Water & environment
River 1.0 km · Mutha
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
3,187 residential projects still under way within 25 km. Step out ring by ring:
Of the 2,112 projects the radar draws within 6 km — every kind, every stage — 747 are residential projects still under way. This list keeps only those, and looks further out.