42 × Tower C · 36 × Tower B · 36 × Tower A · 11 × Bungalow / Villa · 8 × Block F · 8 × Block G · 6 × Block B · 5 × Block C · 3 × Block H · 2 × Block D
Carpet area
360–2921 sq mper-unit range, as filed
Floors
16
Buildings
7
Parking
71 spaces
Land area
17,100 sq m
Sanctioned built-up
13,308 sq m
Recreational open space
1,680 sq m
Timeline
RERA registeredAug 2017
Proposed completionSep 2018
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
157 units across 11 batches
TypeArea sq mCount
Bungalow / Villa5753
Bungalow / Villa1,0568
Block B6656
Block F9168
Block D3602
Block C7215
Block G1,0008
Block H3953
Tower B2,13736
Tower A2,13736
Tower C2,92142
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareNearest hospital 2.4km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 1.7 km · Outer Ring RoadPrimary road 3.5 kmRailway line 4.9 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 678 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
1 complaint · 1 disposed · 0 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC12401132
14 Dec 2024
Order Approveddisposed
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
440 residential projects still under way within 25 km. Step out ring by ring:
Of the 464 projects the radar draws within 6 km — every kind, every stage — 125 are residential projects still under way. This list keeps only those, and looks further out.