HORIZON
Share

ROSE RESIDENCY PHASE - II

P-SGR-21-2884 · RERA Madhya Pradesh · https://gethorizon.in/projects/rose-residency-phase-ii-sagar-8am9lcqk

01

Complete project overview

RERA Madhya Pradesh · Registration filing
Project name
ROSE RESIDENCY PHASE - II
Plots
171 plots
Unit mix
171 × Plot
Quarterly reports
15 on file · latest Jul 2020 - Sep 2020quarterly progress certificates filed with RERA

Timeline

Project startedAug 2020
RERA registeredSep 2021
Proposed completionAug 2023
TodaySep 2026

Find your plot

Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.

171 plots across 1 batch
TypeArea sq mCount
Plot171

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Madhya Pradesh · Builder registration

JYOTI JIMMY ALMEIDA

IndividualPromoter type
1Projects
1City
2021–2023Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Madhya Pradesh · Registration filing
District
Sagar
Tehsil
Sagar
Planning area
Sagar
Address
MOUJA PIPARIYA, PANT NAGAR WARD, SAGAR
What’s nearby
Schools1 school within 1km · College or university 1.7km away
HealthcareHospital 487m away · Clinic within 2km
Lifestyle1 park within 500m
ShoppingSupermarket 804m away
Getting around
Expressway 2.3 kmPrimary road 829 mRailway line 2.4 km · Bina - Katni railwayRailway station 2.7km away (Saugor Railway Station P...... 2)Limited bus connectivity nearby
Water & environment
Water body 1.1 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹5.83 Cr declared to build 171 plots. What that works out to:

₹3.41 Lakhdeclared cost per plotall-in — land + construction
57%of the cost is land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

MP Department of Registration & Stamps

In Madhya Pradesh it’s called the collector guideline rate.

₹10,034per sq yd
₹12,000per sq m
Which rate
open plot, residential
Matched to
The rate published for “GOPAL MANDIR SE SANJAY DRAIVE ROAD TAK”, 120 m from this project.
In force
2026-2027 schedule · effective Apr 2026

Colonies around this project

Pipriya Sagar₹12,000 / sq m₹10,034 / sq yd150 m
NAVKAR COLONY / ROSE VAILY COLONY₹14,000 / sq m₹11,706 / sq yd180 m
ROSE RESIDENCY COLONY₹16,000 / sq m₹13,378 / sq yd310 m
KAKAGANJ PULL SE JHANDA CHOUK MARGHATA BAGHARAJ JANE WALA MARG₹10,000 / sq m₹8,361 / sq yd330 m
SHESH WARD₹12,000 / sq m₹10,034 / sq yd390 m

The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.

What this number is — and isn’t

  • The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of colony, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Madhya Pradesh · Approved building plan

Sagar

Town & Country Planning (DTCP)
Layout Permitapproved 21 Sep 2021 · 5 yrs ago

The promised possession date (20 Aug 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Sagar

Town & Country Planning area · Sagar district

Has approved 50 RERA projects0.9% of Madhya Pradesh.

a plotted-layout market12% apartments · 88% plotted layouts. Your plotted layout is this body's core business.

Builders
33
On record
728 flats · 3,896 plots
Reach
2 tehsils
Since
2017

More layout-heavy than Madhya Pradesh overall — 88% plots here vs 72% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RERA Madhya Pradesh

07

Other projects nearby

The register · within 25 km

21 plotted projects still under way within 25 km. Step out ring by ring:

Of the 40 projects the radar draws within 6 km — every kind, every stage — 20 are plotted projects still under way. This list keeps only those, and looks further out.

1 project within 1 km — showing the nearest 1.

980 m awayPlotted Development

DHARAM SHREE COLONY

M.P.HOUSING BOARD DIVISION SAGAR · Sagar

Oct 2025registered
May 2028target completion
Declared cost₹79.11 CrScale56 plotsAuthorityRERA Madhya Pradesh

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — RERA Madhya Pradesh does not publish a complaints register. This read cannot speak to them either way.