SIGNATURE CITY VISTA
FENWAY BUILDTECH LLP · Gwalior
RR TOWER
Timeline
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
₹45.00 Cr declared to build 253 flats. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
In Madhya Pradesh it’s called the collector guideline rate.
Colonies around this project
| JIWAJI GANJ MAIN ROAD | ₹50,400 / sq m | ₹42,141 / sq yd | 210 m |
|---|---|---|---|
| JIWAJI GANJ MAIN ROAD PAR | ₹50,400 / sq m | ₹42,141 / sq yd | 250 m |
| GHUDCHADI,DHOBI GHAT (MAIN ROAD SE ANDAR),DHOBI WALA CHOK (MAIN ROAD SE ANDAR) | ₹26,400 / sq m | ₹22,074 / sq yd | 260 m |
| JIWAJI GANJ MAIN ROAD SE HATKAR,POTNISH KA BADA,TOPE WALA MOHALLA,SHINDE KI GOTH,MUBARAK ALI KA BADA,MULTANI KI SARAY | ₹34,400 / sq m | ₹28,763 / sq yd | 290 m |
| ANKUR HOSPITAL WALI GALI | ₹30,400 / sq m | ₹25,418 / sq yd | 340 m |
The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.
What this number is — and isn’t
The promised possession date (20 Feb 2018) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Has approved 96 RERA projects — 1.8% of Madhya Pradesh.
a mixed market — 65% apartments · 35% plotted layouts.
More apartment-heavy than Madhya Pradesh overall — 65% apartments here vs 28% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Madhya Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
1 case
| on RR TOWERN.a. |
Only what the builder declared, or what RERA Madhya Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Madhya Pradesh, or that this register doesn’t publish it — never that nothing happened.
4 residential projects still under way within 25 km. Step out ring by ring:
Of the 53 projects the radar draws within 6 km — every kind, every stage — 1 is a residential project still under way. This list keeps only those, and looks further out.
2 projects within 10 km — showing the nearest 2.
FENWAY BUILDTECH LLP · Gwalior
EXECUTIVE ENGINEER M P HOUSING AND INFRASTRUCTURE DEVELOPMENT BOARD DN-2 GWALIOR · Gwalior
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you