The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Kondale
Taluka
Panvel
District
Raigarh
Pincode
410206
Survey no.
1/5A2
North boundary
Open Space
East boundary
7 50 M Wide Road
South boundary
Panvel Kondle Road
West boundary
Open Space
What’s nearby
SchoolsNo schools within 2km
HealthcareNo hospital within 5km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Primary road 4.1 km · SH 54No metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 648 mWater body 3.3 km
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹27,258per sq yd
₹32,600per sq m
Which rate
residential building or flat
Matched to
The rate published for the village of “Kondale”.
In force
2026-2027 schedule
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Navi Mumbai Airport Influence Notified Area
Building Permit
Survey no. 1/5A2
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Navi Mumbai Airport Influence Notified Area
Planning authority
Has approved 16 RERA projects — 0.1% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
12
On record
0 flats · 0 plots
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2,680 residential projects still under way within 25 km. Step out ring by ring:
Of the 50 projects the radar draws within 6 km — every kind, every stage — 23 are residential projects still under way. This list keeps only those, and looks further out.
1 project between 1 and 3 km — showing the nearest 1.
2.7 km awayResidential / Group Housing
SPACE GREENS
Space India Builders & Developer · Dundre · Panvel
5 yr
Dec 2021registered
Dec 2026target completion
Government Guidance Rate₹25,167/sq ydScale242 flatsAuthorityMahaRERA