SATELLITE PRIDE

PR/GJ/RAJKOT/RAJKOT/Others/MAA11754/110523 · GujRERA · https://gethorizon.in/projects/satellite-pride-rajkot-3lgmb11t

01

Complete project overview

GujRERA · Registration filing
Project name
SATELLITE PRIDE
Units
155 units
Mix
155 × Shops And Flats
Carpet area
12–151 sq mper-unit range, as filed
Parking
4 spaces
Land area
2,804 sq m

Timeline

Project startedDec 2022
RERA registeredMay 2023
Proposed completionJun 2026
TodaySep 2026
Construction progress

92% overall, as filed

Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

155 units across 1 batch
TypeArea sq mCount
Shops And Flats40155

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

GujRERA · Builder registration

PANCHRATNA INFRA

PARTNERSHIP FIRMPromoter type
Rajkot, GujaratBased in
2Projects
2Cities
2021–2026Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
209 homeson the public record across 2 projects
9,733 sq mbuilt-up filed
4,513 sq mland declared
₹18.72 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from PANCHRATNA INFRA— the full portfolio →

03

Location & price analysis

GujRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 22 new projects last year
  • 512 nearby projects
1 km radius · coordinates as filed · 22.3295, 70.8199 · © OpenStreetMap contributors
Taluka
Rajkot
District
Rajkot
Address
SATELLITE CHOWK,
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 2.6km away
Lifestyle1 park within 500m
ShoppingNo supermarket within 2km
Getting around
Expressway 1.1 km · Jamnagar Bypass - Rajkot FlyoverPrimary road 270 m · Rajkot - Morbi Highway FlyoverRailway line 594 m · Jamnagar–SurendranagarRailway station 2.6km away (Rajkot Junction)Limited bus connectivity nearby
Water & environment
River 875 mWater body 2.6 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹18.72 Cr declared to build 155 flats. What that works out to:

₹4.55 Lakh – ₹52.80 Lakhdeclared unit pricerange on the filing — not a live asking price
₹12.08 Lakhdeclared cost per flatall-in — land + construction
₹2,910/sq ftof carpet area₹31,323/sq m
18%of the cost is land₹1,118/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

Open ground on the plot until 2022; a building is first visible in 2023 and is about 9 m tall by 2023.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is the plot the promoter drew.

Satellite photographs of the same ground

Feb 2017
Mar 2023
Mar 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • A building is first visible in 2023.
  • Plot outline was drawn by the promoter on the RERA portal and can be misplaced - check it against the image.
  • Coordinate checked only against its district, not its pincode.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Gujarat registration department

In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.

No government guidance rate is shown for this project.

Gujarat's jantri is in Horizon's record, but this filing names no place the book prints — or names two — and a survey number repeats in every village of a district, so nothing can be tied to this project without guessing.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Planning authority

GujRERA · Approved building plan

Others

Building Permitapproved 11 May 2023 · 3 yrs ago

The promised possession date (30 Jun 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

The approving authority

The body that approved this project. It has approved 2,653 RERA projects across 26 talukas about 1 in 6 in Gujarat.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

08

Other projects nearby

The register · within 25 km

410 residential projects still under way within 25 km. Step out ring by ring:

Of the 512 projects the radar draws within 6 km — every kind, every stage — 106 are residential projects still under way. This list keeps only those, and looks further out.

7 projects within 1 km — showing the nearest 6.

390 m awayMixed Development

Pramukh Darshan 3

KHODAL DEVELOPERS · Rajkot

Sep 2023registered
Mar 2026target completion
Declared cost₹12.65 CrScale77 flatsAuthorityGujRERA
750 m awayResidential/Group Housing

Sanidhya Appartment -7

SHREE SHYAM DEVELOPERS · Rajkot

Apr 2023registered
Mar 2026target completion
Declared cost₹2.60 CrScale28 flatsAuthorityGujRERA
780 m awayMixed Development

RAMESHWAR HEIGHTS

VISION BUILDCON · Rajkot

Feb 2024registered
Aug 2026target completion
Price band₹3.15 Lakh–₹15.50 LakhScale69 flatsAuthorityGujRERA
800 m awayMixed Development

PRAMUKH DARSHAN 4

VISHAL HARESHBHAI RADADIYA & Others · Rajkot

Feb 2025registered
Mar 2028target completion
Price band₹7.10 Lakh–₹22.20 LakhScale73 flatsAuthorityGujRERA
860 m awayResidential/Group Housing

SANIDHYA APARTMENT-8

SHWETA CONSTRUCTION · Rajkot

Oct 2023registered
Mar 2026target completion
Declared cost₹3.28 CrScale42 flatsAuthorityGujRERA
990 m awayMixed Development

KESHAV HEIGHTS

SHAYONAM INFRASTRUCTURE LLP · Rajkot

Jun 2024registered
Dec 2027target completion
Price band₹7.55 Lakh–₹25.25 LakhScale76 flatsAuthorityGujRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with GujRERA, as the builder submitted it.
  2. 02Builder's track record
    • GujRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location & price analysis
    • Address, pincode and declared cost: the GujRERA filing.
    • Coordinates: as filed with GujRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • No government guidance rate could be matched to this project from Gujarat's published schedules.
  6. 06Planning authority
    • GujRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  7. 07Complaints & litigation
    • GujRERA's public record lists no complaints or litigation for this project.
  8. 08Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/satellite-pride-rajkot-3lgmb11t.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.